Go North East Fleet Go North East's 6039
November 2017 Go North East
Following temporary loan to Crook Depot, this vehicle has now returned to service at Chester-le-Street Depot.
November 2017 Go North East
This vehicle has transferred from Chester-le-Street Depot to Crook, on temporary loan, to alleviate vehicle shortages.
October 2017 Go North East
Following temporary loan to Crook Depot, this vehicle has now returned to service at Chester-le-Street.
October 2017 Go North East
This vehicle has transferred from Chester-le-Street Depot to Crook, on temporary loan, to alleviate vehicle shortages.
September 2017 Go North East
Following the end of the two-phase Major Line Closure taking place between Monday 31st July and Saturday 2nd September 2017 to allow for work at Northumberland Park station and track and bridge renewal work which forms part of the £350m Metro: all change modernisation programme, this vehicle has returned to service at Chester-le-Street Depot.
July 2017 Go North East
As scholars service 28S does not operate during the school holidays, a single-deck vehicle has been released from this board to be allocated to the double-deck board that this vehicle would ordinarily be allocated to. As such; this vehicle has been released for cascade over the summer, and it has temporarily transferred from Chester-le-Street Depot to Riverside, to operate Metro Replacement service 900. A two-phase Major Line Closure will take place between Monday 31st July and Saturday 2nd September 2017 to allow for work at Northumberland Park station and track and bridge renewal work which forms part of the £350m Metro: all change modernisation programme.
February 2017 Go North East
Following temporary loan to Crook Depot, this vehicle has returned to service at Chester-le-Street.
February 2017 Go North East
This vehicle has transferred from Chester-le-Street Depot to Crook, on temporary loan, to alleviate vehicle shortages.
January 2017 Go North East Photograph by dbp dearingbuspix
http://www.flickr.com/photos/99395428@N03/31870414564/
Following temporary loan to Crook Depot, this vehicle has returned to service at Chester-le-Street.
January 2017 Go North East
This vehicle has transferred from Chester-le-Street Depot to Crook, on temporary loan, to alleviate vehicle shortages.
December 2016 Go North East
This vehicle has transferred from Chester-le-Street Depot to Crook, on temporary loan, to alleviate vehicle shortages.
November 2016 Go North East
This vehicle has transferred from Chester-le-Street Depot to Crook, on temporary loan, to alleviate vehicle shortages.
March 2016 Go North East
Following temporary loan to Stanley Depot, this vehicle has returned to service at Chester-le-Street.
February 2016 Go North East
This vehicle has transferred from Chester-le-Street Depot to Stanley, on temporary loan, to alleviate vehicle shortages.
September 2015 Go North East
This vehicle has been repainted into Go North East's corporate livery.
August 2015 Go North East Photograph by Matthew Jimmison
http://www.flickr.com/photos/127079988@N02/20468734083/
This vehicle has transferred from Deptford Depot to Chester-le-Street.
February 2014 Go North East Photograph by Daniel Graham
http://www.flickr.com/photos/83823112@N03/12277092326/
Following the closure of Gateshead and Winlaton depots, this vehicle has been transferred to the brand new Riverside Depot. Riverside Depot replaces the existing depots at Sunderland Road in Gateshead and Winlaton which date back to the days of the tramways.
November 2006 Go North East
Prior to new branding being launched, this vehicle has been repainted into a plain lime green base livery.
November 2016 Go North East
This vehicle has had its "Northern" branding removed, and hence now carries a plain red base livery with Go North East fleet names.
November 2010 Go North East
Following the entry into service of Mercedes Citaro vehicles at Percy Main on "Cobalt Clipper" services 309/310, this vehicle has been repainted into a plain cream base livery, for allocation to "Coaster" service 1 (receiving appropriate branding at a later date).
November 2010 Go North East
To simplify the services on the Coast Road corridor, services 75/76 will be withdrawn from 13th November 2010. Between Newcastle and North Shields, the services will be replaced by a brand new 310 service, operating every every 15 minutes and serving Coast Road, High Farm, Battle Hill, Middle Engine Lane, Norham Road, Verne Road and Meadow Well. Combined with the existing "Cobalt... see more