Having further reviewed the timetables, it appears Stockton's PVR will reduce by 1 on the 22nd Feburary with the 28/28a/29 cycle being 7 vehicles while the 29a is 2. Presently, 28 and 29/29a both use 5 vehicles.
Having further reviewed the timetables, it appears Stockton's PVR will reduce by 1 on the 22nd Feburary with the 28/28a/29 cycle being 7 vehicles while the 29a is 2. Presently, 28 and 29/29a both use 5 vehicles.