Go North East: Upcoming Service Changes v2
Go North East: Upcoming Service Changes v2
(10 Apr 2019, 5:16 am)Dan What you have to remember is that the 2016 StreetDecks and the 2018 StreetDecks are different buses. Wrightbus have done a lot of work on these buses between the two different batches, one has a Micro-Hybrid 2 system with stop/start engine and the other doesn't.
Micro-Hybrid 3 is now available, and again further development work has been carried out by Wrightbus in the last year to overcome the main issues with the last models. They also now offer a 6-cylinder version of the bus (currently only 4-cylinder).
(10 Apr 2019, 12:48 am)JM03 Angel is a frequent stopping service. It is good on that but are shocking when I've had it on the X21. Much rather keeps these put, the current fleet are fine as they are, maybe a interior refurb.
(10 Apr 2019, 5:16 am)Dan What you have to remember is that the 2016 StreetDecks and the 2018 StreetDecks are different buses. Wrightbus have done a lot of work on these buses between the two different batches, one has a Micro-Hybrid 2 system with stop/start engine and the other doesn't.
Micro-Hybrid 3 is now available, and again further development work has been carried out by Wrightbus in the last year to overcome the main issues with the last models. They also now offer a 6-cylinder version of the bus (currently only 4-cylinder).
(10 Apr 2019, 12:48 am)JM03 Angel is a frequent stopping service. It is good on that but are shocking when I've had it on the X21. Much rather keeps these put, the current fleet are fine as they are, maybe a interior refurb.