Tyne and Wear Metro
Tyne and Wear Metro
(14 Sep 2015, 6:50 pm)Dan I thought it sounded somewhat unrealistic, given that Tommy has previously quoted the weekday PVR (12 minute frequency on each line with extra trains at peak times) being quite high, leaving very little spare trains, when the PVR was previously discussed. The Sunday frequency on each line is 15 minutes, so I can't see the PVR being reduced drastically to allow for 60-70 trains to be made available.
(14 Sep 2015, 6:50 pm)Dan I thought it sounded somewhat unrealistic, given that Tommy has previously quoted the weekday PVR (12 minute frequency on each line with extra trains at peak times) being quite high, leaving very little spare trains, when the PVR was previously discussed. The Sunday frequency on each line is 15 minutes, so I can't see the PVR being reduced drastically to allow for 60-70 trains to be made available.