Menu
 

trending_up Recently Added

August 2017 Go North East Due to a higher vehicle requirement for the second phase of the Major Line Closure, taking place between Monday 31st July and Saturday 2nd September 2017 to allow for work at Northumberland Park station and track and bridge renewal work which forms part of the £350m Metro: all change modernisation programme, this vehicle has transferred from Stanley Depot to Riverside, to operate Metro Replacement service 900.
August 2017 Go North East This vehicle has transferred from Stanley Depot to Chester-le-Street, on temporary loan, to alleviate vehicle shortages.
August 2017 Go North East Having previously carried "Venture" branding; this vehicle has been repainted into a two-tone yellow and maroon base livery, in a bid to improve the external quality of these vehicles, and as part of a minor re-branding exercise.
August 2017 Go North East Having been temporarily withdrawn from service, this vehicle has now been released for internal refurbished and repaint at Bus & Coach World, Blackburn. The extensive refurbishment work includes, but is not limited to, external repaint; deep cleaning of the interior of the vehicle; renewal of floor coverings; cleaning all seat frames and re-trimming seats into leather with USB sockets on the back of every seat; fitting blue accent lighting underneath seats to provide extra light on the gangway; and fitting Next Stop Announcements.
August 2017 Go North East Having been temporarily withdrawn from service, this vehicle has now been released for internal refurbished and repaint at Bus & Coach World, Blackburn. The extensive refurbishment work includes, but is not limited to, external repaint; deep cleaning of the interior of the vehicle; renewal of floor coverings; cleaning all seat frames and re-trimming seats into leather with USB sockets on the back of every seat; fitting blue accent lighting underneath seats to provide extra light on the gangway; and fitting Next Stop Announcements.
August 2017 Go North East This vehicle has returned to Go North East following internal refurbishment and repaint into a light grey base livery. The shade of paint is a different colour to the silver previously used on "The Crusader" service 27, with the company moving away from metallic paint colours in favour of standard solid colours, which are easier to maintain and colour-match when panels are damaged and need to be changed. It is currently undergoing preparation for service at Saltmeadows Road Depot prior to allocation to Riverside Depot.
August 2017 Stagecoach North East Following completion of engine repairs, this vehicle has returned to service at Stockton Depot.
August 2017 Stagecoach North East Photograph by Having previously carried "Club 22" branding, this vehicle has been repainted into Stagecoach's corporate livery.
August 2017 Go North East Though originally intended to return to service at Washington on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Washington, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Though originally intended to return to service at Washington on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Washington, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Though originally intended to return to service at Washington on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Washington, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Though originally intended to return to service at Washington on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Washington, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Though originally intended to return to service at Chester-le-Street on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Chester-le-Street, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Though originally intended to return to service at Chester-le-Street on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Chester-le-Street, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Though originally intended to return to service at Chester-le-Street on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Chester-le-Street, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Though originally intended to return to service at Chester-le-Street on 9th August 2017, the diversion route continued on until this day due to the works on the Washington Highway being continued into this day. As such, a day later than expected, this vehicle has now returned to service at Chester-le-Street, with the "Red Arrows" X1 service returning to the route it usually operates.
August 2017 Go North East Due to a higher vehicle requirement for the second phase of the Major Line Closure, taking place between Monday 31st July and Saturday 2nd September 2017 to allow for work at Northumberland Park station and track and bridge renewal work which forms part of the £350m Metro: all change modernisation programme, this vehicle has transferred from Deptford Depot to Riverside, to operate Metro Replacement service 900.
August 2017 Go North East Having previously carried "TEN" branding, this vehicle has been repainted into a dark green base livery. As part of ongoing improvements to services on the Tyne Valley, Go North East will re-brand its "TEN" 10/10A/10B/10X services as "Tyne Valley Ten" on a green base livery, moving away from the silver livery which the vehicles allocated to these services have carried since 2008. The new brand is designed to represent the picturesque Tyne Valley corridor and promotes the frequent buses to Metrocentre and Newcastle which the "TEN" group of services provide, up to every 10 minutes. The introduction of new vehicles on "Tyne Tees Xpress" services... see more
August 2017 Go North East Following temporary loan to Crook Depot, this vehicle has returned to service at Chester-le-Street.
First Back 305.42105263158 Next Last