(03 Feb 2024, 12:04 pm)Storx https://democracy.darlington.gov.uk/docu...Report.pdfThe 36/37/38 seem to get upgraded every 5 year with new buses in 2009, 2014, 2019 so I would guess it’s very likely if they successful at least some of them will be used on them. That would certainly see off the enviro 300 and man 18.220s.
Assume it's linked to this that's been leaked by Darlington Council. If, they win the ZEBRA 2 bid then there's 63 electric buses due between Redcar (Arriva), Darlington (Arriva) and Stockton (Stagecoach). What routes, as far as I'm aware, isn't in public domain though.
I'd be surprised if it's not the 12 or 36/37/38 with Stagecoach though as they were the principal corridors for upgrades in an earlier TVCA document.
(03 Feb 2024, 12:48 pm)Michael Bet they end up at Stockton or Hartlepool.
(03 Feb 2024, 12:04 pm)Storx https://democracy.darlington.gov.uk/docu...Report.pdfThe 36/37/38 seem to get upgraded every 5 year with new buses in 2009, 2014, 2019 so I would guess it’s very likely if they successful at least some of them will be used on them. That would certainly see off the enviro 300 and man 18.220s.
Assume it's linked to this that's been leaked by Darlington Council. If, they win the ZEBRA 2 bid then there's 63 electric buses due between Redcar (Arriva), Darlington (Arriva) and Stockton (Stagecoach). What routes, as far as I'm aware, isn't in public domain though.
I'd be surprised if it's not the 12 or 36/37/38 with Stagecoach though as they were the principal corridors for upgrades in an earlier TVCA document.
(03 Feb 2024, 12:48 pm)Michael Bet they end up at Stockton or Hartlepool.