Arriva North East: Upcoming Service Changes
Arriva North East: Upcoming Service Changes
(30 Nov 2016, 10:35 pm)mb134 Definitely agree with your points on the 35, unless they have a plan nobody on here knows about to get rid of the Streetlites, and get in more double deck vehicles? Not too sure where they'd come from like.
Regarding the X21/22 timings, they had it running like clockwork prior to those September 2012 changes (when they decided running the X22 in a loop around Bedlington, at the time serving zero stops for half of it). I used the X21 daily at the time, as I had since September 2011, and the change in punctuality was unbelievable. Made worse by the withdrawal of Olympians around the same time, it must be said.
I'd welcome the 52 changes if they were an all day thing, as it would help connect SE Northumberland even more, and provide more links, while competing with the seemingly increasingly unreliable 19. However they just seem like a bit of an after thought.
(30 Nov 2016, 10:35 pm)mb134 Definitely agree with your points on the 35, unless they have a plan nobody on here knows about to get rid of the Streetlites, and get in more double deck vehicles? Not too sure where they'd come from like.
Regarding the X21/22 timings, they had it running like clockwork prior to those September 2012 changes (when they decided running the X22 in a loop around Bedlington, at the time serving zero stops for half of it). I used the X21 daily at the time, as I had since September 2011, and the change in punctuality was unbelievable. Made worse by the withdrawal of Olympians around the same time, it must be said.
I'd welcome the 52 changes if they were an all day thing, as it would help connect SE Northumberland even more, and provide more links, while competing with the seemingly increasingly unreliable 19. However they just seem like a bit of an after thought.