(31 May 2016, 3:55 pm)streetlite5402 I've heard it's to be withdrawn and possibly replaced with something more cost-effective. The Greenside-Blackhall Mill section of the route is secured by NEXUS.
(31 May 2016, 3:55 pm)streetlite5402 I've heard it's to be withdrawn and possibly replaced with something more cost-effective. The Greenside-Blackhall Mill section of the route is secured by NEXUS.