Go North East: Service Suggestions v2
Extend the 71 to Sunderland, to give them a rough every 30 mins between seaham and Sunderland or re-time X6/62/71 at a 20 min frequency Replace the X6/38A, with the 9 as that does have a long enough layover to cover it