Go North East: Service Suggestions v2
Go North East: Service Suggestions v2
(12 Nov 2021, 12:35 pm)cbma06 Looks like the X6/55 are being set up for withdrawl , since the x1 extension to Peterlee and the 62 roughly timed with one of the 55’s and the 62 timed about the same time as the x6.
With the 71 between Chester and Houghton , I would renumber it with the Chester locals.
With the 71 between Seaham and Houghton , I would extend the nexus 37 from Doxford park to Seaham via Burdon road and Burdon Lane, if the Houghton to Seaham link has to be maintained then run one of those 65’s as a 66 and run it the same way as the 71 to Houghton then rainton bridge then up Hetton downs into Hetton interchange then joining up with the normal 65 to Durham, but the 66 would have to be operated by a solo’s due to the estates in Seaham where it’s secured.
Sent from my iPhone using Tapatalk
(12 Nov 2021, 12:35 pm)cbma06 Looks like the X6/55 are being set up for withdrawl , since the x1 extension to Peterlee and the 62 roughly timed with one of the 55’s and the 62 timed about the same time as the x6.
With the 71 between Chester and Houghton , I would renumber it with the Chester locals.
With the 71 between Seaham and Houghton , I would extend the nexus 37 from Doxford park to Seaham via Burdon road and Burdon Lane, if the Houghton to Seaham link has to be maintained then run one of those 65’s as a 66 and run it the same way as the 71 to Houghton then rainton bridge then up Hetton downs into Hetton interchange then joining up with the normal 65 to Durham, but the 66 would have to be operated by a solo’s due to the estates in Seaham where it’s secured.
Sent from my iPhone using Tapatalk