Go North East: Service Suggestions v2
Go North East: Service Suggestions v2
(03 Jun 2023, 9:23 am)Dan I would like to think most of GNE’s cuts have already been made, over several iterations of ‘getting fit for the future’.
If anything, GNE seem to be looking towards growth (North Tyneside) and re-building the network (gradual reinstatement of frequency on 8, 65, X6) at the moment.
The scale of the Arriva cuts seem to be similar to that of the scale of GNE’s previous cuts.
Sent from my iPhone using Tapatalk
(03 Jun 2023, 9:23 am)Dan I would like to think most of GNE’s cuts have already been made, over several iterations of ‘getting fit for the future’.
If anything, GNE seem to be looking towards growth (North Tyneside) and re-building the network (gradual reinstatement of frequency on 8, 65, X6) at the moment.
The scale of the Arriva cuts seem to be similar to that of the scale of GNE’s previous cuts.
Sent from my iPhone using Tapatalk