Go North East: Service Suggestions v2
Go North East: Service Suggestions v2
(08 Dec 2023, 10:01 pm)Storx Driver cancellations are the problem for the X30/X31 rather than time keeping, I believe.Doesn't sound a bad idea to be honest.
For the 12 though if there's no plans for that or the 57 to ever be upped in frequency again, you'd probably be better merging the 12 and 57 as one super route. If I've worked it out it should be around a 168 minute round trip so would be a PVR 6, which is a reduction of 1 (currently 7). Could move E200MMC's back to Riverside and allocate them on that and the X66 and give a much needed improvement for both.
The 57 sitting around for 20 minutes or so in Newcastle, as it does now, is bad timetabling. Would also give a direct link from Newcastle Business Park to Gateshead and beyond.
(08 Dec 2023, 10:01 pm)Storx Driver cancellations are the problem for the X30/X31 rather than time keeping, I believe.Doesn't sound a bad idea to be honest.
For the 12 though if there's no plans for that or the 57 to ever be upped in frequency again, you'd probably be better merging the 12 and 57 as one super route. If I've worked it out it should be around a 168 minute round trip so would be a PVR 6, which is a reduction of 1 (currently 7). Could move E200MMC's back to Riverside and allocate them on that and the X66 and give a much needed improvement for both.
The 57 sitting around for 20 minutes or so in Newcastle, as it does now, is bad timetabling. Would also give a direct link from Newcastle Business Park to Gateshead and beyond.