Andreos1



14,155
09 May 2013, 4:09 pm #1
Unusual working heading north now on the ECML.
Heading north on a1 between Darlington and Durham where the two run parallel - it was an electric 3 carriage scotrail.

Edit: www.realtimetrains.co.uk/train/K98020/2013/05/09/advanced This was it
Edited 09 May 2013, 6:31 pm by Andreos1.
Andreos1
09 May 2013, 4:09 pm #1

Unusual working heading north now on the ECML.
Heading north on a1 between Darlington and Durham where the two run parallel - it was an electric 3 carriage scotrail.

Edit: www.realtimetrains.co.uk/train/K98020/2013/05/09/advanced This was it

Adrian



9,566
09 May 2013, 6:44 pm #2
There's been a few problems on the ECML today. Someone hit by a train in the York area I believe. I got the 16.00 HST back from Kings Cross though, and there were no issues then.

Forum Moderator | Find NEB on facebook
Adrian
09 May 2013, 6:44 pm #2

There's been a few problems on the ECML today. Someone hit by a train in the York area I believe. I got the 16.00 HST back from Kings Cross though, and there were no issues then.


Forum Moderator | Find NEB on facebook

Andreos1



14,155
02 Jun 2013, 9:58 am #3
Massive closure/diversion on the ECML today.
Everything diverted via Lincoln, Sleaford and Spalding to Peterbrough.

The Retford, Newark and Grantham section is quiet as a result.

Edit: strange, some stuff is getting through via Retford, Newark and Grantham, but other trains are being diverted...
Edited 02 Jun 2013, 10:07 am by Andreos1.
Andreos1
02 Jun 2013, 9:58 am #3

Massive closure/diversion on the ECML today.
Everything diverted via Lincoln, Sleaford and Spalding to Peterbrough.

The Retford, Newark and Grantham section is quiet as a result.

Edit: strange, some stuff is getting through via Retford, Newark and Grantham, but other trains are being diverted...

Andreos1



14,155
20 Sep 2013, 6:51 pm #4
Punctuality problems on the ECML over the summer and a short article about it from the BBC.

Www.bbc.co.uk/news/uk-24178232

'Illegitimis non carborundum'
Andreos1
20 Sep 2013, 6:51 pm #4

Punctuality problems on the ECML over the summer and a short article about it from the BBC.

Www.bbc.co.uk/news/uk-24178232


'Illegitimis non carborundum'

Adam



717
29 Oct 2013, 2:05 pm #5
There was a piece on the lunchtime Look North news about punctuality on the line. There's a bigger report on the 6:30 news if anyone's interested.

Amyway, it said that the three biggest delays this year were caused because of the actual line and the overhead wires. They interviewed a bloke from Network Rail and he said that the line is "worn" and "old", so it makes you wonder if its more beneficial to significantly upgrade the ECML and WCML instead of wasting goodness knows how many billions of pounds on HS2.
Edited 29 Oct 2013, 2:07 pm by Adam.
Adam
29 Oct 2013, 2:05 pm #5

There was a piece on the lunchtime Look North news about punctuality on the line. There's a bigger report on the 6:30 news if anyone's interested.

Amyway, it said that the three biggest delays this year were caused because of the actual line and the overhead wires. They interviewed a bloke from Network Rail and he said that the line is "worn" and "old", so it makes you wonder if its more beneficial to significantly upgrade the ECML and WCML instead of wasting goodness knows how many billions of pounds on HS2.

Andreos1



14,155
29 Oct 2013, 2:18 pm #6
(29 Oct 2013, 2:05 pm)Adam There was a piece on the lunchtime Look North news about punctuality on the line. There's a bigger report on the 6:30 news if anyone's interested.

Amyway, it said that the three biggest delays this year were caused because of the actual line and the overhead wires. They interviewed a bloke from Network Rail and he said that the line is "worn" and "old", so it makes you wonder if its more beneficial to significantly upgrade the ECML and WCML instead of wasting goodness knows how many billions of pounds on HS2.

When the ECML was electrified in the late 80's, it was done on the cheap.
20 years on, it regularly fails.

Whether HS2 comes along or not, there needs to be a massive investment into the ECML, just to keep it going.

'Illegitimis non carborundum'
Andreos1
29 Oct 2013, 2:18 pm #6

(29 Oct 2013, 2:05 pm)Adam There was a piece on the lunchtime Look North news about punctuality on the line. There's a bigger report on the 6:30 news if anyone's interested.

Amyway, it said that the three biggest delays this year were caused because of the actual line and the overhead wires. They interviewed a bloke from Network Rail and he said that the line is "worn" and "old", so it makes you wonder if its more beneficial to significantly upgrade the ECML and WCML instead of wasting goodness knows how many billions of pounds on HS2.

When the ECML was electrified in the late 80's, it was done on the cheap.
20 years on, it regularly fails.

Whether HS2 comes along or not, there needs to be a massive investment into the ECML, just to keep it going.


'Illegitimis non carborundum'

Adrian



9,566
29 Oct 2013, 5:34 pm #7
They really need to look at the capacity too. It's beyond me why they' haven't yet announced reopening the Leamside line. Even if they shoved freight along it.

Forum Moderator | Find NEB on facebook
Adrian
29 Oct 2013, 5:34 pm #7

They really need to look at the capacity too. It's beyond me why they' haven't yet announced reopening the Leamside line. Even if they shoved freight along it.


Forum Moderator | Find NEB on facebook

Andreos1



14,155
13 Nov 2013, 6:57 pm #8
www.publications.parliament.uk/pa/cm201314/cmhansrd/cm131112/halltext/131112h0001.htm#13111244000001

Text of debate on future of ECML led by local MP Sharon Hodgson.

'Illegitimis non carborundum'
Andreos1
13 Nov 2013, 6:57 pm #8

www.publications.parliament.uk/pa/cm201314/cmhansrd/cm131112/halltext/131112h0001.htm#13111244000001

Text of debate on future of ECML led by local MP Sharon Hodgson.


'Illegitimis non carborundum'

13 Nov 2013, 10:00 pm #9
(29 Oct 2013, 5:34 pm)aureolin They really need to look at the capacity too. It's beyond me why they' haven't yet announced reopening the Leamside line. Even if they shoved freight along it.

Reopening the Leamside line will be a tad more expensive since there is no longer any track.

Please feel free to visit my Flickr page - https://www.flickr.com/photos/gjm-photogenic/
Who needs heroes anyway? Villians have more fun.
Rapidsnap
13 Nov 2013, 10:00 pm #9

(29 Oct 2013, 5:34 pm)aureolin They really need to look at the capacity too. It's beyond me why they' haven't yet announced reopening the Leamside line. Even if they shoved freight along it.

Reopening the Leamside line will be a tad more expensive since there is no longer any track.


Please feel free to visit my Flickr page - https://www.flickr.com/photos/gjm-photogenic/
Who needs heroes anyway? Villians have more fun.

MrFozz

Marxista Fozzski

5,562
14 Nov 2013, 9:16 am #10
(13 Nov 2013, 10:00 pm)GMitchelhill Reopening the Leamside line will be a tad more expensive since there is no longer any track.

Would the track not have needed replacing anyway, due to no use in the best part of 25 years...
MrFozz
14 Nov 2013, 9:16 am #10

(13 Nov 2013, 10:00 pm)GMitchelhill Reopening the Leamside line will be a tad more expensive since there is no longer any track.

Would the track not have needed replacing anyway, due to no use in the best part of 25 years...

Andreos1



14,155
14 Nov 2013, 12:39 pm #11
(14 Nov 2013, 9:16 am)fozzovmurton Would the track not have needed replacing anyway, due to no use in the best part of 25 years...

Apart from the few miles of track that was stolen from Penshaw, the signalling/cabling would have needed replacing too.

I live in hope that it will be re-opened, but like QCS, I think it is doomed to failure because the powers that be, don't live in the real world.

'Illegitimis non carborundum'
Andreos1
14 Nov 2013, 12:39 pm #11

(14 Nov 2013, 9:16 am)fozzovmurton Would the track not have needed replacing anyway, due to no use in the best part of 25 years...

Apart from the few miles of track that was stolen from Penshaw, the signalling/cabling would have needed replacing too.

I live in hope that it will be re-opened, but like QCS, I think it is doomed to failure because the powers that be, don't live in the real world.


'Illegitimis non carborundum'

Adrian



9,566
14 Nov 2013, 2:38 pm #12
(14 Nov 2013, 12:39 pm)andreos1 Apart from the few miles of track that was stolen from Penshaw, the signalling/cabling would have needed replacing too.

I live in hope that it will be re-opened, but like QCS, I think it is doomed to failure because the powers that be, don't live in the real world.

I agree whole heartedly with the final paragraph. The labour party glove puppets are nearly as far out of this world as the Tory scumbags. What happened to Sharon Hodgson's metro campaign? That appears to have died a death, and she hasn't paid an ounce of notice to QCS. Too wrapped up in the Surestart stuff.

Forum Moderator | Find NEB on facebook
Adrian
14 Nov 2013, 2:38 pm #12

(14 Nov 2013, 12:39 pm)andreos1 Apart from the few miles of track that was stolen from Penshaw, the signalling/cabling would have needed replacing too.

I live in hope that it will be re-opened, but like QCS, I think it is doomed to failure because the powers that be, don't live in the real world.

I agree whole heartedly with the final paragraph. The labour party glove puppets are nearly as far out of this world as the Tory scumbags. What happened to Sharon Hodgson's metro campaign? That appears to have died a death, and she hasn't paid an ounce of notice to QCS. Too wrapped up in the Surestart stuff.


Forum Moderator | Find NEB on facebook

MrFozz

Marxista Fozzski

5,562
14 Nov 2013, 3:38 pm #13
(14 Nov 2013, 12:39 pm)andreos1 Apart from the few miles of track that was stolen from Penshaw, the signalling/cabling would have needed replacing too.

I live in hope that it will be re-opened, but like QCS, I think it is doomed to failure because the powers that be, don't live in the real world.

There was also the problem of landslips and vegetation made parts of it look like a forest, I walked the line from Sulgrave to Penshaw a few years ago with my dog and it was in a very sorry state indeed...

I can certainly see the need for it, even if it is only for freight and the ocassional diversion for the ECML and Durham Coast Services, it would free up paths between Newcastle and Northallerton and Newcastle and Hartlepool by using the Leamside and the Stillington Branch
MrFozz
14 Nov 2013, 3:38 pm #13

(14 Nov 2013, 12:39 pm)andreos1 Apart from the few miles of track that was stolen from Penshaw, the signalling/cabling would have needed replacing too.

I live in hope that it will be re-opened, but like QCS, I think it is doomed to failure because the powers that be, don't live in the real world.

There was also the problem of landslips and vegetation made parts of it look like a forest, I walked the line from Sulgrave to Penshaw a few years ago with my dog and it was in a very sorry state indeed...

I can certainly see the need for it, even if it is only for freight and the ocassional diversion for the ECML and Durham Coast Services, it would free up paths between Newcastle and Northallerton and Newcastle and Hartlepool by using the Leamside and the Stillington Branch

Andreos1



14,155
14 Nov 2013, 7:04 pm #14
(14 Nov 2013, 3:38 pm)fozzovmurton There was also the problem of landslips and vegetation made parts of it look like a forest, I walked the line from Sulgrave to Penshaw a few years ago with my dog and it was in a very sorry state indeed...

I can certainly see the need for it, even if it is only for freight and the ocassional diversion for the ECML and Durham Coast Services, it would free up paths between Newcastle and Northallerton and Newcastle and Hartlepool by using the Leamside and the Stillington Branch

The track is the clearest it has been for years these days.
A lot of trees and vegetation were cleared when the lines were removed.

'Illegitimis non carborundum'
Andreos1
14 Nov 2013, 7:04 pm #14

(14 Nov 2013, 3:38 pm)fozzovmurton There was also the problem of landslips and vegetation made parts of it look like a forest, I walked the line from Sulgrave to Penshaw a few years ago with my dog and it was in a very sorry state indeed...

I can certainly see the need for it, even if it is only for freight and the ocassional diversion for the ECML and Durham Coast Services, it would free up paths between Newcastle and Northallerton and Newcastle and Hartlepool by using the Leamside and the Stillington Branch

The track is the clearest it has been for years these days.
A lot of trees and vegetation were cleared when the lines were removed.


'Illegitimis non carborundum'

Andreos1



14,155
25 Aug 2015, 12:04 pm #15
http://www.passengertransport.co.uk/2015...prospects/
New model for ORR applications

'Illegitimis non carborundum'
Andreos1
25 Aug 2015, 12:04 pm #15

http://www.passengertransport.co.uk/2015...prospects/
New model for ORR applications


'Illegitimis non carborundum'

Andreos1



14,155
12 May 2016, 7:57 am #16
http://orr.gov.uk/news-and-media/news-an...-main-line

New services approved.

'Illegitimis non carborundum'
Andreos1
12 May 2016, 7:57 am #16

http://orr.gov.uk/news-and-media/news-an...-main-line

New services approved.


'Illegitimis non carborundum'

12 May 2016, 3:39 pm #17
London - Edinburgh Open Access Service approved with Newcastle and Morpeth named on the stopping list  
Fares look exciting.....

More info on the above and more below
http://www.railjournal.com/index.php/mai...vices.html

My New Flickr https://www.flickr.com/photos/140662069@N02/ - Posts every Weekend at the minimum Smile
South Tyne Lad
12 May 2016, 3:39 pm #17

London - Edinburgh Open Access Service approved with Newcastle and Morpeth named on the stopping list  
Fares look exciting.....

More info on the above and more below
http://www.railjournal.com/index.php/mai...vices.html


My New Flickr https://www.flickr.com/photos/140662069@N02/ - Posts every Weekend at the minimum Smile

Andreos1



14,155
01 Jun 2016, 3:42 pm #18
VTEC have tweeted about delays near Peterborough, due to a train fire.

They have clarified it isn't one of theirs.

'Illegitimis non carborundum'
Andreos1
01 Jun 2016, 3:42 pm #18

VTEC have tweeted about delays near Peterborough, due to a train fire.

They have clarified it isn't one of theirs.


'Illegitimis non carborundum'

01 Jun 2016, 4:15 pm #19
(01 Jun 2016, 3:42 pm)Andreos1 VTEC have tweeted about delays near Peterborough, due to a train fire.

They have clarified it isn't one of theirs.

Tried having a look on the maps earlier but couldn't find an obvious one. All sorted now, normal working resumed.

Forum Moderator  |  Find us on facebook

[Image: 0a85ed5b4e97324e338555472f222830.png]
northern156
01 Jun 2016, 4:15 pm #19

(01 Jun 2016, 3:42 pm)Andreos1 VTEC have tweeted about delays near Peterborough, due to a train fire.

They have clarified it isn't one of theirs.

Tried having a look on the maps earlier but couldn't find an obvious one. All sorted now, normal working resumed.


Forum Moderator  |  Find us on facebook

[Image: 0a85ed5b4e97324e338555472f222830.png]

Adrian



9,566
01 Jun 2016, 5:14 pm #20
(01 Jun 2016, 3:42 pm)Andreos1 VTEC have tweeted about delays near Peterborough, due to a train fire.

They have clarified it isn't one of theirs.
(01 Jun 2016, 4:15 pm)northern156 Tried having a look on the maps earlier but couldn't find an obvious one. All sorted now, normal working resumed.

It'll be one of those bloody freight trains no doubt... Wink

Forum Moderator | Find NEB on facebook
Adrian
01 Jun 2016, 5:14 pm #20

(01 Jun 2016, 3:42 pm)Andreos1 VTEC have tweeted about delays near Peterborough, due to a train fire.

They have clarified it isn't one of theirs.
(01 Jun 2016, 4:15 pm)northern156 Tried having a look on the maps earlier but couldn't find an obvious one. All sorted now, normal working resumed.

It'll be one of those bloody freight trains no doubt... Wink


Forum Moderator | Find NEB on facebook