North East BSIP: £804 Million Pound Plan For North East Buses
North East BSIP: £804 Million Pound Plan For North East Buses
(06 Feb 2022, 7:19 am)54APhotography I wouldn't expect building listing would allow for much change to the building at Central, but removal of the drop off area and routing of buses through there would make more sense. When there was impetus behind a metro terminus at Central (for a western extension via Scotswood, Metro Centre and beyond), the parcels area was the choice, therefore removing the car park/staff access which would make a problem for a bus only section. Despite appearance on google earth, there isn't an awful lot of 'length' for a long line of stops, unless you had two 'platforms', but even then the one closest to the A186 would have to be shorter to allow for the squeeze as the road swings towards the exit.
(06 Feb 2022, 7:19 am)54APhotography I wouldn't expect building listing would allow for much change to the building at Central, but removal of the drop off area and routing of buses through there would make more sense. When there was impetus behind a metro terminus at Central (for a western extension via Scotswood, Metro Centre and beyond), the parcels area was the choice, therefore removing the car park/staff access which would make a problem for a bus only section. Despite appearance on google earth, there isn't an awful lot of 'length' for a long line of stops, unless you had two 'platforms', but even then the one closest to the A186 would have to be shorter to allow for the squeeze as the road swings towards the exit.