(11 Apr 2016, 8:38 am)Michael wrote Loads of upcoming Sunderland changes..............
...
PB0002404/281 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Cancellation Accepted: Operating between Sunderland Fawcett Street and Sunderland Fawcett Street given service number 12 effective from 05-Jun-2016.
--------------------------------------------------------
I thought the 5A would be dropped, i would imagine the Docks part is the 77A?.
22nd May for the GNE changes
5th June for the Stagecoach changes
I thought they would of wanted them to change on the same day, especially when the GNE service 33 will be going down the docks and the NEXUS contract changes.
Does this mean we will see the 5/5A and the 33 going down to docks until the Stagecoach changes come in to force?
I don't think 22079-82 have long left at Sunderland!