Menu
 
Kuyoyo   28 Apr 2019, 8:13 am
#22
(27 Apr 2019, 10:05 pm)Adrian wrote Anything planned across the Transporter bridge, or is it closed for abseiling again?

H106 will be going over the Transporter this year - leaving the South Side at 12.35 and Middlesbrough at 12.44., returning to the Transporter at 13.20.
  
Powered by MyBB, © 2002-2024 MyBB Group.
Made with by Curves UI.