(09 Oct 2020, 5:31 pm)V514DFT wrote Heres a crazy suggestionYou'd be better off merging the 11 and 42/42A if anything. Or extending 311 to Wallsend.
Would there be a way of making this work
Merging the 11 with the Hadrian Park-Wallsend section of the 41, number it 40,then the 41 can continue to operate the Wallsend-Holy Cross-Rosehill-Howdon Hadrian Park section like it used to,then the 40 does Hadrian Park-Battle Hill-High Farm-Wallsend the every 30 mins does the current 11, and the 41 could interwork with the 40 that would do the current 11, crazy suggestion but thought i'd put it out there
RE: Go North East: Service Suggestions v2
Twitter: @ASX_Terranova
Blog: https://asxterranova.home.blog/
Blog: https://asxterranova.home.blog/