(06 Feb 2023, 7:47 am)Jimmi wrote I wouldn't say it needs a full decker output, although a few extra deckers at Darlington would help as some runs at peak times are getting allocated singles when a decker is really needed, plus you lose two of the E400s on weekdays as there's a 5/5A board that requires one with another needing to be deployed on the X26.
Aye that's fair, but surely it would be better just doing all the boards if they could. Never know investment might help it grow as it's been a bit of a shambles lately from what I've heard. That and the 6 have almost been forgotten about lately imo. Similar with the 63 in Redcar which seems to be stuck with the awful Temsa's lately for a flagship route.