(27 Mar 2024, 7:52 pm)ASX_Terranova wrote How many would they need to have every route as a double set. Also why are their fares so high?
I don't know ive heard there are 34 different diagrams needed every day so 68, theyve got 54 so theyll have 62 i think.
But they want to expand Newcastle-Reading increased to hourly, and there are some frequency reductions around yorkshire and manchester which are massively struggling so they might have a frequency increase too.
But it depends if the DFT will give them anymore as there could be several options
Avanti 221 get either lengthened and keep the buffet car or keep the same and remove the buffet car, but what you could do is extend the Avanti to 6/7 car and shorten some of the 4 cars to 3 for emptier services or to put 3 trains together say 5/5/3 to create a 13 car train as some XC even dualled up are at capacity. Same with the Merdian if they could get the 7 car trains which theyve got then attacch a 4 to them for the busiest services, meanwhile some 5 cars can go onto the Liverpool-Norwich Line leaving the remaning to go over to XC to boost capacity and add new routes.
The fares are ridiculous to go from Newcastle to Reading its cheaper to go via Kings Cross and Paddington. But before COVID they used to return to the govement but now it's got one of the highest subsideys