![]() |
Stagecoach North East: Upcoming Service Changes - Printable Version +- North East Buses (https://northeastbuses.co.uk) +-- Forum: Local Bus Scene (https://northeastbuses.co.uk/forumdisplay.php?fid=1) +--- Forum: Stagecoach North East (https://northeastbuses.co.uk/forumdisplay.php?fid=57) +--- Thread: Stagecoach North East: Upcoming Service Changes (/showthread.php?tid=1032) |
RE: Stagecoach North East: Upcoming Service Changes - Michael - 04 Mar 2022 PB0002404/389 New BUSWAYS TRAVEL SERVICES LTD 19 (19) Sunderland, Downhill Seaburn Effective date: 15 Apr 2022 End date: 04 Sep 2022 RE: Stagecoach North East: Upcoming Service Changes - Train8261 - 04 Mar 2022 (04 Mar 2022, 5:46 pm)Michael wrote PB0002404/389Can understand this. It was really well received RE: Stagecoach North East: Upcoming Service Changes - DaveFromUpNorth - 04 Mar 2022 Good news personally i think if you are near or passing a Metro Station or Bus station a loop past the bus station should be utilised I also think any secured services should go via a interchange or hub Looking at Wallsend Yes the high Street the bus stops all around but often the buses don't go to the bus station which connects to the Metro - we assume most people can walk or feel safe walking distances Creating an easy connection hub is what is needed I may be cynical but personally I think the new 317 service should go via Jarrow Bus Station Crazy thought but from North Shields head through the tunnel to Jarrow Bus Station then to Wallsend Bus Station And Vice Verser The connection from Jarrow to Wallsend would be the key and if it is Nexus Secured there is no commercial liability RE: Stagecoach North East: Upcoming Service Changes - Train8261 - 04 Mar 2022 (04 Mar 2022, 8:37 pm)DaveFromUpNorth wrote Good news personally i think if you are near or passing a Metro Station or Bus station a loop past the bus station should be utilisedCould replace the South Shields 10/11 RE: Stagecoach North East: Upcoming Service Changes - Omega54 - 04 Mar 2022 (04 Mar 2022, 8:39 pm)Train8261 wrote Could replace the South Shields 10/11Would you not think a possible extension of the new GNE 11 or 310 to Amazon/Heworth might be quite good Via Jarrow. Opens up links for people working at Amazon who need to cross the tyne, so they don't pay the fee. RE: Stagecoach North East: Upcoming Service Changes - Storx - 04 Mar 2022 (04 Mar 2022, 8:37 pm)DaveFromUpNorth wrote Good news personally i think if you are near or passing a Metro Station or Bus station a loop past the bus station should be utilised I'm not sure how plausible it would be timetabling wise but if you wanted to do that I'd split the service 3 ways and maybe use Percy Main Metro as a hub. So you'd have 3 services with them all interworking at Percy Main, pick whatever numbers. R1 - Whitley Bay to South Shields hourly R2 - Whitley Bay to Wallsend hourly. R3 - Wallsend to South Shields hourly. If you could timetable it right you'd end up not really losing anything but creating new links in the process with: R1/R2 - 30 minute service between Whitley Bay and Percy Main R2/R3 - 30 minute service between Wallsend and Percy Main R1/R3 - 30 minute service between Percy Main and Jarrow In the process you've linked Wallsend and South Shields/Jarrow with a service at the same time and also gave a hourly service from Whitley Bay across the Tyne direct. RE: Stagecoach North East: Upcoming Service Changes - Train8261 - 04 Mar 2022 (04 Mar 2022, 8:45 pm)Omega54 wrote Would you not think a possible extension of the new GNE 11 or 310 to Amazon/Heworth might be quite good Via Jarrow.If a thing like that was possible Gne would have to see if anyone lives in NT to do a link like that otherwise it would be pointless 310 could do it but wouldn't it be a bit overkill to send the service from North Shields to Follingsby via Jarrow. I mean it would save anyone who uses the metro on the South Shields line RE: Stagecoach North East: Upcoming Service Changes - Rapidsnap - 04 Mar 2022 Somehow I don't think the residents of Percy Main will be pleased with the amount of buses you suggest, it's already bad enough of a rat run as it is. RE: Stagecoach North East: Upcoming Service Changes - Omega54 - 04 Mar 2022 (04 Mar 2022, 11:27 pm)Rapidsnap wrote Somehow I don't think the residents of Percy Main will be pleased with the amount of buses you suggest, it's already bad enough of a rat run as it is.I don't think They need to worry about percy main depot for much longer, chances are it will be gone in a few years. RE: Stagecoach North East: Upcoming Service Changes - Storx - 05 Mar 2022 (04 Mar 2022, 11:27 pm)Rapidsnap wrote Somehow I don't think the residents of Percy Main will be pleased with the amount of buses you suggest, it's already bad enough of a rat run as it is. It's only 3 buses an hour, not that many in both directions. Believe the 11 already serves it in one direction only anyway already if I'm right. Not sure on the 317. RE: Stagecoach North East: Upcoming Service Changes - Rapidsnap - 05 Mar 2022 11 and probably the 317 when it become active service PM in both directions. Wallsend bound buses loop around the roundabout and go back on themselves to enter the village operating past the cricket club. RE: Stagecoach North East: Upcoming Service Changes - DaveFromUpNorth - 05 Mar 2022 Making percy main as a hub for connections actually weakens connectivity Making Wallsend Bus Station as a hub to connectivity creates physiological connections If as a tax payer I'm paying £40 an hour for a seured service to connect to a hub and a secured service is not connecting to a "integrated service hub" questions need to be asked Atm to go from Jarrow Bus Station to Anywhere close to a work environment North of the Tyne like Silverlink or Cobalt its a 90+ min journey with a forced connection at Haymarket When the metro Is off or the ferry is off we have created a link let's face it Ferry is dependent on wind and water to disrupt it Metro you just need leaves Creating a hub barrier and link could increase passenger numbers too Percy main residence would welcome increased Bus links? RE: Stagecoach North East: Upcoming Service Changes - Thomas12 - 06 Mar 2022 (05 Mar 2022, 11:56 pm)DaveFromUpNorth wrote Making percy main as a hub for connections actually weakens connectivity Not really, it’s probably about half an hour if you get the 10/11 to Royal Quays and then the 19 to Cobalt. RE: Stagecoach North East: Upcoming Service Changes - LVK 404L - 06 Mar 2022 Do we think perhaps we could see some greater expansion into North Tyneside from SNE at both Newcastle and South Shields depots once the 317 commences and fhe existing 10/11 services from Shields there could be the temptation for more. Yes presently the 10/11 from South to North takes an age but there is plenty of scope to adapt existing other services or the introduction of new services later on. Be interesting to see how this develops over time. Could South Shields introduce additional to Tynemouth and Whitley Bay, with direct routes it is a possibility. RE: Stagecoach North East: Upcoming Service Changes - Storx - 06 Mar 2022 (05 Mar 2022, 11:56 pm)DaveFromUpNorth wrote Making percy main as a hub for connections actually weakens connectivity See I disagree with Wallsend as it's too out the way. I do agree about the Cobalt comments imo the route going through the tunnel should follow the route below. I know it was a route that Nexus identified years ago but it never happened. ![]() The route should be all about connecting the Metro lines which don't exist atm. Percy Main makes sense as it's the shortest point between there and Jarrow, it's simple to change on the Metro for those wanting to go to Wallsend, Tynemouth, Whitley Bay or wherever. RE: Stagecoach North East: Upcoming Service Changes - DaveFromUpNorth - 06 Mar 2022 But putting Wallsend Bus Station where most buses serve compared to Percy Main Metro creates the link You could live in say Walker and get the bus to Wallsend Bus Station to change for one bus to Jarrow or Amazon at Follingsby I did suggest a few months ago Follingsby Amazon to Jarrow to Wallsend Freeman and Regent Centre However when Amazon has compiled the survey they can see what the results say RE: Stagecoach North East: Upcoming Service Changes - Storx - 07 Mar 2022 (06 Mar 2022, 9:31 pm)DaveFromUpNorth wrote But putting Wallsend Bus Station where most buses serve compared to Percy Main Metro creates the link The thing is though for somewhere like Walker it would be just as quick (once accounting for changes on a 30 minute service) going to Jarrow to get a bus to Monument and then change onto the Metro which are both every 12/15 minutes. I could imagine it's the same for most places West of the A19. It's arguably people from the East of the A19 who will want a connection via the tunnel. If you pushed the route well I could imagine you could get a few punters South of the Tyne heading through the tunnel to Silverlink similar to many pensioners do to the Arnison. The cinema is much cheaper than Newcastle aswell and there's a Nando's and other stuff and you can get argubly everything you need with a Boots, Argos, M&S, Pound or Less, Halfords, Clothes Shops. RE: Stagecoach North East: Upcoming Service Changes - Michael - 07 Mar 2022 (04 Mar 2022, 5:46 pm)Michael wrote PB0002404/389 From the CSV sheet: Following customer requests, exprimental seasonal service to return for 2022 season with a few minor amends also.. it starts on Good Friday. RE: Stagecoach North East: Upcoming Service Changes - Train8261 - 07 Mar 2022 (07 Mar 2022, 8:08 pm)Michael wrote From the CSV sheet:An extension Two buses instead of 1 Worder what that means by a few minor amends RE: Stagecoach North East: Upcoming Service Changes - Rapidsnap - 08 Mar 2022 27725 is currently out and about on route learning duties. Currently showing a bunch of drivers the 317 route, noted heading into Holy Cross heading to Whitley Bay about 1pm. RE: Stagecoach North East: Upcoming Service Changes - Rapidsnap - 08 Mar 2022 And noted passing my shop in Wallsend at 1430 returning to depot. RE: Stagecoach North East: Upcoming Service Changes - Train8261 - 08 Mar 2022 (08 Mar 2022, 2:40 pm)Rapidsnap wrote And noted passing my shop in Wallsend at 1430 returning to depot.Bustimes.org shows its route learning as you said previously RE: Stagecoach North East: Upcoming Service Changes - V514DFT - 09 Mar 2022 (08 Mar 2022, 2:40 pm)Rapidsnap wrote And noted passing my shop in Wallsend at 1430 returning to depot.Aye i saw one on Friday (4th) directly behind the 11 heading for Wallsend RE: Stagecoach North East: Upcoming Service Changes - Michael - 31 Mar 2022 (04 Mar 2022, 5:46 pm)Michael wrote PB0002404/389 Timetable now on bustimes.org.. https://bustimes.org/services/19-sunderland-downhill-seaburn RE: Stagecoach North East: Upcoming Service Changes - Acky81 - 31 Mar 2022 Wish they would do an open top from the south side of Sunderland to the seafront RE: Stagecoach North East: Upcoming Service Changes - Michael - 31 Mar 2022 Looks like 1 of the open top buses will be used on the E services over Easter: https://tiscon-maps-stagecoachbus.s3.amazonaws.com/Timetables/North%20East/NE_SunderlandE1,E2,E6BankHolidayTimetable2022Apr.pdf RE: Stagecoach North East: Upcoming Service Changes - stagecoachbusdepot - 31 Mar 2022 (31 Mar 2022, 5:57 pm)Michael wrote Looks like 1 of the open top buses will be used on the E services over Easter: Looks like two will be used based on the timings. Wonder why they are only doing it bank holiday weekends - the 19 only has PVR of one so they should have plenty of spare capacity to run a couple of open toppers every day (or at least every weekend) RE: Stagecoach North East: Upcoming Service Changes - Michael - 07 Apr 2022 PB0002404/390 New BUSWAYS TRAVEL SERVICES LTD LS1 (LS1) Discovery Museum Discovery Museum Effective date14 May 2022 End date14 May 2022 PB0002404/345 Variation BUSWAYS TRAVEL SERVICES LTD 939 (939) Sunderland Park Lane Team valley North end Effective date24 Apr 2022 RE: Stagecoach North East: Upcoming Service Changes - Michael - 07 Apr 2022 (04 Mar 2022, 5:46 pm)Michael wrote PB0002404/389 Full press release on the site today: https://www.stagecoachbus.com/service-updates/serviceupdatesarticle?SituationId=ID-07/04/2022-13:22:10:878 E1 timetable for when its a open top: https://tiscon-maps-stagecoachbus.s3.amazonaws.com/Timetables/North%20East/Sunderland/Ecos%20OT%20BH%20timetable.pdf 19 timetable - https://tiscon-maps-stagecoachbus.s3.amazonaws.com/Timetables/North%20East/Sunderland/NE_Sunderland19Timetable2022April.pdf RE: Stagecoach North East: Upcoming Service Changes - V514DFT - 07 Apr 2022 (07 Apr 2022, 4:41 pm)Michael wrote PB0002404/390Whats the LS1 for,i see its only running for a day |