![]() |
|
The North East Rail Vision - Printable Version +- North East Buses (https://northeastbuses.co.uk) +-- Forum: Local Bus Scene (https://northeastbuses.co.uk/forumdisplay.php?fid=1) +--- Forum: North East Mayoral Strategic Authority (https://northeastbuses.co.uk/forumdisplay.php?fid=91) +--- Thread: The North East Rail Vision (/showthread.php?tid=4830) |
The North East Rail Vision - Adrian - 26 Sep 2026 NEMSA Cabinet released the long-awaited North East Rail Vision at Tuesday's cabinet meeting, which is a high-level visionary document which sets out the Mayor’s priorities for rail in the region up to 2040. The vision is supposed to set out the practical steps needed to deliver change, which NEMSA include:
I've added links to some of the key documents below: North East Rail Vision Report to Cabinet Appendix A - North East Rail Vision, summary document Appendix B - North East Rail Vision Appendix C - Washington Metro and Leamside South The key things that I've noted are that there's an immediate desire to bring in local rail part of the 'Angel Network', integrated buses, Metro and other modes. Long term ambitions are the Leamside in full (which we knew about), and extending other lines to either increase capacity or link other places. Northumberland Line being one, with the plan to open up to Newbiggin-by-the-Sea. There's references to building up a project pipeline, which returns again to reopening passenger services on the Stillington Branch and Ferryhill station, but also the Bensham Curve. RE: The North East Rail Vision - V514DFT - 28 Sep 2026 Wasn't there talk of looping the Northumberland Line round to meet the ECML at Morpeth at one point RE: The North East Rail Vision - Adrian - 29 Sep 2026 (28 Sep 2026, 7:56 pm)V514DFT wrote Wasn't there talk of looping the Northumberland Line round to meet the ECML at Morpeth at one point It's one of SENRUG's campaigns, but I don't think it's grown legs beyond that stage - https://www.senrug.co.uk/NorthumberlandLineExtension-Bedlington-Choppington-Morpeth.php It would be a relatively simple one to achieve, but I suspect the barrier is the traffic on the ECML already. Unless they ever went down Gareth Dennis' suggestion of a Morpeth curve, I'd suspect they'd need to try and fit a bay platform in for it. RE: The North East Rail Vision - Storx - 29 Sep 2026 (29 Sep 2026, 4:13 pm)Adrian wrote It's one of SENRUG's campaigns, but I don't think it's grown legs beyond that stage - https://www.senrug.co.uk/NorthumberlandLineExtension-Bedlington-Choppington-Morpeth.php It's not really worth it tbh imo. I know there's been talk about extending the Morpeth stopped through to Bedlington Station though. It sits around a fair chunk of the day doing nothing anyway so its PVR neutral. Not sure why it never happened tbh. RE: The North East Rail Vision - V514DFT - 30 Sep 2026 My worry is long term for the NL with it being as successful as has, the single track, the single platforms, and the stock used |