(16 Feb 2017, 6:52 pm)Tom Wrote: Don't think so as the capacity required will be more than 23 I would think. Would have thought they would get new stock, maybe Streetlites or something.
The bid submitted by Central was based on a capacity of 23 for M71 & 335 with a capacity of 16 for W3.