North East Buses

Full Version: 2026 New Vehicles
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7
(13 Jun 2026, 5:36 pm)busesofthenortheast wrote [ -> ]It all depends on when they arrive because with Redcar depot closing they could possibly arrive at Stockton but let’s just wait and see what happens

And there won't be on any Stockton work routes 

There be on the 63 65 64s  as intended E200MMCs 18 of them  


Been told 1496 1502 will be sent to Whitby depo  

7596 97  will permanent be at Whitby including winter time tables incase they are in need of a replacement incase of a brake down 

2 deckers will also be on the 63 65 for school work

 X4s will be Evoras  as intended  as lites aren't sutble for the route

X3 x2 62 will be pulsars or possibly a E200MMC
(13 Jun 2026, 7:40 pm)Dan manger wrote [ -> ]And there won't be on any Stockton work routes 

There be on the 63 65 64s  as intended E200MMCs  18 of them  


Been told 1496 1502 will be sent to Whitby depo  

7596 97  will permanent be at Whitby including winter time tables incase they are in need of a replacement incase of a brake down 

2 deckers will also be on the 63 65 for school work

 X4s will be Evoras  as intended  as lites aren't sutble for the route

X3 x2 62  will be pulsars  or possibly a E200MMC

If there are two deckers going on the 63/64/65 circuit then how can they all be based at Whitby? Explain how you’d get Whitby drivers to operate those without a huge cost. 
With two boards being DD operated I think we all know the two spare E200s will go elsewhere, and will end up on a mix of work. I’d assume the X4 fleet will probably rotate as they do now without a fixed allocation.
(13 Jun 2026, 8:52 pm)tyresmoke wrote [ -> ]If there are two deckers going on the 63/64/65 circuit then how can they all be based at Whitby? Explain how you’d get Whitby drivers to operate those without a huge cost. 
With two boards being DD operated I think we all know the two spare E200s will go elsewhere, and will end up on a mix of work. I’d assume the X4 fleet will probably rotate as they do now without a fixed allocation.

 The spare  deckers 7578 79 80 81 
Obviously  two will more than likely go to Ashington like always for The winter period  that's where the other 2 would fit in to the 63 65 cycle for the schoolars


7726 31 will be allocated to the x93s  as by then the b9s should be at Ashington by then 


U normally also get two deckers on the 62s so I wouldn't be surprised if that's 7598.99 during the winter months
(13 Jun 2026, 11:26 pm)Dan manger wrote [ -> ] The spare  deckers 7578 79 80 81 
Obviously  two will more than likely go to Ashington like always for The winter period  that's where the other 2 would fit in to the 63 65 cycle for the schoolars


7726 31 will be allocated to the x93s  as by then the b9s should be at Ashington by then 


U normally also get two deckers on the 62s so I wouldn't be surprised if that's 7598.99 during the winter months

I have it on authority from people in positions within the company where the decisions are made (and very likely Tyresmoke has similar information), that the deckers for the 63 are 7596 and 7597 - not to say of course once the X94 and Park & Ride finishes for the winter, others appear on there. With the clearance to use the deckers on 63 boards (naturally except those that work any X2 X3 or X4A trips), the likelihood of deckers appearing on the 62 will probably be minimum if ever.
(13 Jun 2026, 3:36 pm)Shrek wrote [ -> ]Looking at a post on LinkedIn from one of the partners at the launch, they seem to be suggesting they will be on the roads next week.

The last information I heard was similar as that posted above by Olympian - another infrastructure issue has delayed the roll out again.
(Yesterday, 11:04 am)PH - BQA wrote [ -> ]The last information I heard was similar as that posted above by Olympian - another infrastructure issue has delayed the roll out again.

Sounds like this is an issue for a lot of companies, not just bus companies. I can understand why a lot of people are reluctant to go electric when the infrastructure is clearly so far behind schedule and not enough investment or available companies to do the work quickly.
Pages: 1 2 3 4 5 6 7