Michael



19,145
16 Jun 2014, 6:32 pm #1
All changes for Stagecoach from VOSA go here or any upcoming changes!
Edited 16 Jun 2014, 6:39 pm by Michael.

Ooo Friend, Bus Friend.
Michael
16 Jun 2014, 6:32 pm #1

All changes for Stagecoach from VOSA go here or any upcoming changes!


Ooo Friend, Bus Friend.

Michael



19,145
16 Jun 2014, 6:41 pm #2
Changes to Services 3, 5/5A, 10, 11, 13, 16 and 20 from Sunday 22 June 2014

http://www.stagecoachbus.com/tis-service...px?id=1893

Ooo Friend, Bus Friend.
Michael
16 Jun 2014, 6:41 pm #2

Changes to Services 3, 5/5A, 10, 11, 13, 16 and 20 from Sunday 22 June 2014

http://www.stagecoachbus.com/tis-service...px?id=1893


Ooo Friend, Bus Friend.

Michael



19,145
05 Jul 2014, 9:53 am #3
Disruptions due to Summer Festival Parade on Saturday 5 July 2014

We have been advised that the Summer Festival Opening Parade will be taking place on Saturday 5 July 2014.

Last Updated: 30 June 2014 11:42 AM

To ensure health and safety is maintained, Ocean Road and parts of Sea Road will need to be closed between approximately 1230 – 1430.

During affected times, Service E1 and the Open Top City Sightseeing buses will be required to divert between South Shields Town Centre and New Crown Hotel via Anderson Street, Beach Road, Salisbury Place, Sea Way and Bents Park Road in both directions, observing all stops along the line of the diversionary route.

In addition, all services in the town may also be temporarily delayed by a rolling road closure along Fowler Street, or may be diverted away from the affected area. As a consequence of these road closures, buses are likely to be unable to serve the bus stops at Keppel Street, Fowler Street or Town Hall between approx 1230 - 1330, with all bus services in the town diverting via Station Road.

Although our local authority colleagues will endeavour to ensure that the impact on bus services is as limited as possible, there is still likely to be significant traffic congestion in the town centre area and along Ocean Road.

Due to the various road closures, and the congestion that will be created due to traffic displacement, all bus services may be subject to delay, or may be temporary diverted around the affected areas. Stagecoach apologise for any inconvenience or delays this event may cause, which is due to circumstances beyond our control.

Services Affected: 1, 2, 3, 4, 7, 8, 10, 11, 12, 17, 18, 30, E1, E2, E6, X20

Originally Posted: 06 June 2014 12:17 PM

Ooo Friend, Bus Friend.
Michael
05 Jul 2014, 9:53 am #3

Disruptions due to Summer Festival Parade on Saturday 5 July 2014

We have been advised that the Summer Festival Opening Parade will be taking place on Saturday 5 July 2014.

Last Updated: 30 June 2014 11:42 AM

To ensure health and safety is maintained, Ocean Road and parts of Sea Road will need to be closed between approximately 1230 – 1430.

During affected times, Service E1 and the Open Top City Sightseeing buses will be required to divert between South Shields Town Centre and New Crown Hotel via Anderson Street, Beach Road, Salisbury Place, Sea Way and Bents Park Road in both directions, observing all stops along the line of the diversionary route.

In addition, all services in the town may also be temporarily delayed by a rolling road closure along Fowler Street, or may be diverted away from the affected area. As a consequence of these road closures, buses are likely to be unable to serve the bus stops at Keppel Street, Fowler Street or Town Hall between approx 1230 - 1330, with all bus services in the town diverting via Station Road.

Although our local authority colleagues will endeavour to ensure that the impact on bus services is as limited as possible, there is still likely to be significant traffic congestion in the town centre area and along Ocean Road.

Due to the various road closures, and the congestion that will be created due to traffic displacement, all bus services may be subject to delay, or may be temporary diverted around the affected areas. Stagecoach apologise for any inconvenience or delays this event may cause, which is due to circumstances beyond our control.

Services Affected: 1, 2, 3, 4, 7, 8, 10, 11, 12, 17, 18, 30, E1, E2, E6, X20

Originally Posted: 06 June 2014 12:17 PM


Ooo Friend, Bus Friend.

Michael



19,145
05 Jul 2014, 10:08 am #4
(05 Jul 2014, 10:05 am)AIG20 I assume the information relating to the Airshow (including the shuttle service 510 and the revised "E" services) will be uploaded onto the website on Monday or some time next week, as Stagecoach usually give a month's notice of all the changes/disruptions that are going to occur.

Looks like that way, should be the same as last year.


GNE have theirs on and it has the 26/26A on....

Ooo Friend, Bus Friend.
Michael
05 Jul 2014, 10:08 am #4

(05 Jul 2014, 10:05 am)AIG20 I assume the information relating to the Airshow (including the shuttle service 510 and the revised "E" services) will be uploaded onto the website on Monday or some time next week, as Stagecoach usually give a month's notice of all the changes/disruptions that are going to occur.

Looks like that way, should be the same as last year.


GNE have theirs on and it has the 26/26A on....


Ooo Friend, Bus Friend.

Michael



19,145
14 Jul 2014, 11:00 am #5
PB0002404/71 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between South Shields and Newcastle given service number 553 effective from 07-Sep-2014. To amend Timetable.

PB0002404/306 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Cancellation Accepted: Operating between South Shields Anderson Street and Newcastle given service number 554 effective from 07-Sep-2014.

Ooo Friend, Bus Friend.
Michael
14 Jul 2014, 11:00 am #5

PB0002404/71 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between South Shields and Newcastle given service number 553 effective from 07-Sep-2014. To amend Timetable.

PB0002404/306 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Cancellation Accepted: Operating between South Shields Anderson Street and Newcastle given service number 554 effective from 07-Sep-2014.


Ooo Friend, Bus Friend.

Dan

Site Administrator

18,100
14 Jul 2014, 11:14 am #6
(14 Jul 2014, 11:12 am)AIG20 I wonder whether some Gas Buses will be used alongside the E400s this year, instead of Slatyford's MAN ALX300s.

Would be a good idea - but Slatyford drivers would then need to receive driver familiarisation, unless Sunderland were going to operate them instead.
Dan
14 Jul 2014, 11:14 am #6

(14 Jul 2014, 11:12 am)AIG20 I wonder whether some Gas Buses will be used alongside the E400s this year, instead of Slatyford's MAN ALX300s.

Would be a good idea - but Slatyford drivers would then need to receive driver familiarisation, unless Sunderland were going to operate them instead.

Michael



19,145
16 Jul 2014, 4:37 pm #7
Couple of road closures in Sunderland

4th Field Regiment parade in Sunderland - Saturday 4 August 2014 -
http://www.stagecoachbus.com/tis-service...px?id=2475


Southwick Summer Streets Parade - Saturday 19 July 2014 - http://www.stagecoachbus.com/tis-service...px?id=2474
Edited 16 Jul 2014, 4:37 pm by Michael.

Ooo Friend, Bus Friend.
Michael
16 Jul 2014, 4:37 pm #7

Couple of road closures in Sunderland

4th Field Regiment parade in Sunderland - Saturday 4 August 2014 -
http://www.stagecoachbus.com/tis-service...px?id=2475


Southwick Summer Streets Parade - Saturday 19 July 2014 - http://www.stagecoachbus.com/tis-service...px?id=2474


Ooo Friend, Bus Friend.

Michael



19,145
17 Jul 2014, 5:10 pm #8
Temporary closure of Burdon Road, affecting Services 8, 20 and E1, E2, E6- http://www.stagecoachbus.com/tis-service...px?id=2509

“Colour run” at Sunderland Stadium of Light – Sunday 20 July 2014 -
http://www.stagecoachbus.com/tis-service...px?id=2505

Ooo Friend, Bus Friend.
Michael
17 Jul 2014, 5:10 pm #8

Temporary closure of Burdon Road, affecting Services 8, 20 and E1, E2, E6- http://www.stagecoachbus.com/tis-service...px?id=2509

“Colour run” at Sunderland Stadium of Light – Sunday 20 July 2014 -
http://www.stagecoachbus.com/tis-service...px?id=2505


Ooo Friend, Bus Friend.

Michael



19,145
22 Jul 2014, 4:48 pm #9
Once again....

Temporary westbound closure of Durham Road, affecting Services 3, 4, 23

On Sunday 10 August 2014, Durham Road will be closed to westbound traffic at the Tudor Grove junction whilst the carriageway is resurfaced.

Last Updated: 22 July 2014 2:03 PM

These roadworks are programmed to be in place during Sunday 10 August 2014 only, between approximately 0800 and 1800.

During the periods of the road closure, Service 3, 4, and 23 buses towards Thorney Close, Farringdon and Doxford Park will be required to divert from Barnes Park non-stop via Silksworth Lane and Premier Road. Buses will thus be unable to serve their westbound stops along Durham Road between Barnes Park and the Prospect junction.

Northbound Service 3, 4 and 23 buses (towards Sunderland City Centre) will be unaffected by these works.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 3, 4, 23

Originally Posted: 22 July 2014 2:02 PM

Ooo Friend, Bus Friend.
Michael
22 Jul 2014, 4:48 pm #9

Once again....

Temporary westbound closure of Durham Road, affecting Services 3, 4, 23

On Sunday 10 August 2014, Durham Road will be closed to westbound traffic at the Tudor Grove junction whilst the carriageway is resurfaced.

Last Updated: 22 July 2014 2:03 PM

These roadworks are programmed to be in place during Sunday 10 August 2014 only, between approximately 0800 and 1800.

During the periods of the road closure, Service 3, 4, and 23 buses towards Thorney Close, Farringdon and Doxford Park will be required to divert from Barnes Park non-stop via Silksworth Lane and Premier Road. Buses will thus be unable to serve their westbound stops along Durham Road between Barnes Park and the Prospect junction.

Northbound Service 3, 4 and 23 buses (towards Sunderland City Centre) will be unaffected by these works.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 3, 4, 23

Originally Posted: 22 July 2014 2:02 PM


Ooo Friend, Bus Friend.

Michael



19,145
23 Jul 2014, 9:02 am #10
Closure of Queen Alexandra Road, affecting Services 18 and 19

From Monday 4 August 2014, Queen Alexandra Road will be closed between Tunstall Road and Ashbrooke Range to resurface the carriageway.

Last Updated: 22 July 2014 1:53 PM

These roadworks are likely to be in place from Monday 4 August 2014, for around 4 days, generally between 0800 - 1800.

During the periods of the road closure, Services 18 and 19 will be unable to serve Tunstall Road, Queen Alexandra Road, Sea View Road West or the Eye Hospital. Buses will instead operate via Leechmere Road and Helvellyn Road, u-turning at the Hill View Road roundabout.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 18, 19

Originally Posted: 22 July 2014 1:45 PM

Ooo Friend, Bus Friend.
Michael
23 Jul 2014, 9:02 am #10

Closure of Queen Alexandra Road, affecting Services 18 and 19

From Monday 4 August 2014, Queen Alexandra Road will be closed between Tunstall Road and Ashbrooke Range to resurface the carriageway.

Last Updated: 22 July 2014 1:53 PM

These roadworks are likely to be in place from Monday 4 August 2014, for around 4 days, generally between 0800 - 1800.

During the periods of the road closure, Services 18 and 19 will be unable to serve Tunstall Road, Queen Alexandra Road, Sea View Road West or the Eye Hospital. Buses will instead operate via Leechmere Road and Helvellyn Road, u-turning at the Hill View Road roundabout.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 18, 19

Originally Posted: 22 July 2014 1:45 PM


Ooo Friend, Bus Friend.

Michael



19,145
24 Jul 2014, 2:38 pm #11
Temporary southbound closure of Bedford Street, affecting Services 3, 4, 13, 16, 23, E1, E2 and E6

On Sundays 3 and 10 August 2014, Bedford Street will be temporarily closed to all southbound traffic to enable carriageway works.

Last Updated: 23 July 2014 6:42 PM

These roadworks are programmed to be in place during Sundays 3 and 10 August 2014, between approximately 0700 and 1800.

During the periods of the road closure, southbound Services 3, 4, 13, 16, 23, E1, E2 and E6 will be required to operate non-stop via West Wear Street and High Street West into John Street.

Whilst there will be no bus stops omitted by the southbound route, the increase in mileage may result in some minor delays to services.

There will be no affect on the route of northbound buses.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 3, 4, 13, 16, 23, E1, E2, E6

Originally Posted: 23 July 2014 6:41 PM

Ooo Friend, Bus Friend.
Michael
24 Jul 2014, 2:38 pm #11

Temporary southbound closure of Bedford Street, affecting Services 3, 4, 13, 16, 23, E1, E2 and E6

On Sundays 3 and 10 August 2014, Bedford Street will be temporarily closed to all southbound traffic to enable carriageway works.

Last Updated: 23 July 2014 6:42 PM

These roadworks are programmed to be in place during Sundays 3 and 10 August 2014, between approximately 0700 and 1800.

During the periods of the road closure, southbound Services 3, 4, 13, 16, 23, E1, E2 and E6 will be required to operate non-stop via West Wear Street and High Street West into John Street.

Whilst there will be no bus stops omitted by the southbound route, the increase in mileage may result in some minor delays to services.

There will be no affect on the route of northbound buses.

Stagecoach would like to apologise for any inconvenience these temporary works authorised by Sunderland City Council may cause, and we remain grateful for customers’ patience and understanding.

Services Affected: 3, 4, 13, 16, 23, E1, E2, E6

Originally Posted: 23 July 2014 6:41 PM


Ooo Friend, Bus Friend.

Michael



19,145
28 Jul 2014, 10:31 am #12
PB0002404/77 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Sunderland John Street and Doxford International given service number X1 effective from 22-Sep-2014. To amend Stopping Places and Timetable.

Ooo Friend, Bus Friend.
Michael
28 Jul 2014, 10:31 am #12

PB0002404/77 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Sunderland John Street and Doxford International given service number X1 effective from 22-Sep-2014. To amend Stopping Places and Timetable.


Ooo Friend, Bus Friend.

Michael



19,145
05 Aug 2014, 8:45 am #13
Minor change to Service X1 from Monday 22 September 2014

Following customer requests, all Service X1 journeys are revised to additionally stop on Bede Bank, outside Sunderland College.

Last Updated: 04 August 2014 6:06 PM

To improve connections for customers, most Service X1 journeys are also slightly retimed, and will operate up to 5 minutes later.

http://www.stagecoachbus.com/PdfUploads/...957_X1.pdf - New timetable here

Services Affected: X1

Originally Posted: 04 August 2014 6:05 PM
Edited 05 Aug 2014, 8:45 am by Michael.

Ooo Friend, Bus Friend.
Michael
05 Aug 2014, 8:45 am #13

Minor change to Service X1 from Monday 22 September 2014

Following customer requests, all Service X1 journeys are revised to additionally stop on Bede Bank, outside Sunderland College.

Last Updated: 04 August 2014 6:06 PM

To improve connections for customers, most Service X1 journeys are also slightly retimed, and will operate up to 5 minutes later.

http://www.stagecoachbus.com/PdfUploads/...957_X1.pdf - New timetable here

Services Affected: X1

Originally Posted: 04 August 2014 6:05 PM


Ooo Friend, Bus Friend.

Michael



19,145
07 Aug 2014, 4:09 pm #14
Special bus services on Great North Run Day

On Sunday 7 September, special Services 552 and 553 will operate between the finish line and Newcastle City Centre or South Shields Ferry.

Last Updated: 07 August 2014 4:46 PM

Also, due to temporary road closures associated with the Great North Run, many Stagecoach buses within South Shields will also be temporarily revised, with some services not running until later in the afternoon.

http://www.stagecoachbus.com/great-north...ields.aspx

Services Affected: 1, 2, 3, 4, 7, 8, 10, 11, 12, 12A, 17, 18, 30, 574, 575, E1, E2, E6, X20

Originally Posted: 07 August 2014 4:37 PM

Ooo Friend, Bus Friend.
Michael
07 Aug 2014, 4:09 pm #14

Special bus services on Great North Run Day

On Sunday 7 September, special Services 552 and 553 will operate between the finish line and Newcastle City Centre or South Shields Ferry.

Last Updated: 07 August 2014 4:46 PM

Also, due to temporary road closures associated with the Great North Run, many Stagecoach buses within South Shields will also be temporarily revised, with some services not running until later in the afternoon.

http://www.stagecoachbus.com/great-north...ields.aspx

Services Affected: 1, 2, 3, 4, 7, 8, 10, 11, 12, 12A, 17, 18, 30, 574, 575, E1, E2, E6, X20

Originally Posted: 07 August 2014 4:37 PM


Ooo Friend, Bus Friend.

Michael



19,145
08 Aug 2014, 7:46 pm #15
(08 Aug 2014, 7:43 pm)AIG20 All services that use the Wearmouth Bridge during the closures will divert via the "Queen Alexandra Bridge" instead.

Closures of Monkwearmouth Bridgehead Roundabout, affecting Services 3,4,5A,13,16,23,E1,E2,E6:


Gonna be really fun

Ooo Friend, Bus Friend.
Michael
08 Aug 2014, 7:46 pm #15

(08 Aug 2014, 7:43 pm)AIG20 All services that use the Wearmouth Bridge during the closures will divert via the "Queen Alexandra Bridge" instead.

Closures of Monkwearmouth Bridgehead Roundabout, affecting Services 3,4,5A,13,16,23,E1,E2,E6:


Gonna be really fun


Ooo Friend, Bus Friend.

Michael



19,145
08 Aug 2014, 7:51 pm #16
(08 Aug 2014, 7:49 pm)AIG20 In addition, nothing has been mentioned on the Nexus and GNE website yet.

Surprised at NEXUS... doesn't surprise me with GNE tbh, even though someone posted about it the other day

Ooo Friend, Bus Friend.
Michael
08 Aug 2014, 7:51 pm #16

(08 Aug 2014, 7:49 pm)AIG20 In addition, nothing has been mentioned on the Nexus and GNE website yet.

Surprised at NEXUS... doesn't surprise me with GNE tbh, even though someone posted about it the other day


Ooo Friend, Bus Friend.

Dan

Site Administrator

18,100
08 Aug 2014, 7:53 pm #17
(08 Aug 2014, 7:51 pm)Michael Surprised at NEXUS... doesn't surprise me with GNE tbh, even though someone posted about it the other day

I've mentioned it to Go North East; as I said before, the council has not discussed the works with Go North East yet.

Clearly Stagecoach has pestered the council a lot more than Go North East.
Dan
08 Aug 2014, 7:53 pm #17

(08 Aug 2014, 7:51 pm)Michael Surprised at NEXUS... doesn't surprise me with GNE tbh, even though someone posted about it the other day

I've mentioned it to Go North East; as I said before, the council has not discussed the works with Go North East yet.

Clearly Stagecoach has pestered the council a lot more than Go North East.

Michael



19,145
08 Aug 2014, 7:54 pm #18
(08 Aug 2014, 7:53 pm)Dan I've mentioned it to Go North East; as I said before, the council has not discussed the works with Go North East yet.

Clearly Stagecoach has pestered the council a lot more than Go North East.

It says:

In our most recent discussions, we have been able to agree with Sunderland City Council for the bridgehead to remain open, as a “bus only route” during the main daytime period of Sunday 17 August 2014, during which period it will be closed to all other traffic.

Soooo least Stagecoach have tried... GNE will wait till last minute like always and they will claim to of only known from that day..

Ooo Friend, Bus Friend.
Michael
08 Aug 2014, 7:54 pm #18

(08 Aug 2014, 7:53 pm)Dan I've mentioned it to Go North East; as I said before, the council has not discussed the works with Go North East yet.

Clearly Stagecoach has pestered the council a lot more than Go North East.

It says:

In our most recent discussions, we have been able to agree with Sunderland City Council for the bridgehead to remain open, as a “bus only route” during the main daytime period of Sunday 17 August 2014, during which period it will be closed to all other traffic.

Soooo least Stagecoach have tried... GNE will wait till last minute like always and they will claim to of only known from that day..


Ooo Friend, Bus Friend.

Dan

Site Administrator

18,100
08 Aug 2014, 7:56 pm #19
(08 Aug 2014, 7:54 pm)Michael It says:

In our most recent discussions, we have been able to agree with Sunderland City Council for the bridgehead to remain open, as a “bus only route” during the main daytime period of Sunday 17 August 2014, during which period it will be closed to all other traffic.

Soooo least Stagecoach have tried... GNE will wait till last minute like always and they will claim to of only known from that day..

Go North East has tried too. I'd actually say they're pretty good at keeping customers informed well in advance, and it's quite unusual for them to give less than week's notice in this case.

Like I say, when I gave them the head's up about it, they would have got in touch with the council then - but clearly got no where.

Stagecoach would have only received this information today, otherwise they would have had it on the website sooner. How do we know that Go North East hasn't just received the same information today too?
Dan
08 Aug 2014, 7:56 pm #19

(08 Aug 2014, 7:54 pm)Michael It says:

In our most recent discussions, we have been able to agree with Sunderland City Council for the bridgehead to remain open, as a “bus only route” during the main daytime period of Sunday 17 August 2014, during which period it will be closed to all other traffic.

Soooo least Stagecoach have tried... GNE will wait till last minute like always and they will claim to of only known from that day..

Go North East has tried too. I'd actually say they're pretty good at keeping customers informed well in advance, and it's quite unusual for them to give less than week's notice in this case.

Like I say, when I gave them the head's up about it, they would have got in touch with the council then - but clearly got no where.

Stagecoach would have only received this information today, otherwise they would have had it on the website sooner. How do we know that Go North East hasn't just received the same information today too?

Michael



19,145
08 Aug 2014, 7:57 pm #20
(08 Aug 2014, 7:55 pm)AIG20 I wonder how much it will effect the PVR/layover time on these services, as they may include shorter breaks for the drivers and more/less buses may be needed.

In addition, if the whole of "North Bridge Street" is closed on the evenings it may make it much harder for the buses to get to and from the depot.

The whole area, like the road and the roundabout/bridge should be done soon, leaving only the square left... i'm hoping they open both roads, including the new road leading to the car park while still working on the new square... and not waiting till the square is done to open it fully..

Ooo Friend, Bus Friend.
Michael
08 Aug 2014, 7:57 pm #20

(08 Aug 2014, 7:55 pm)AIG20 I wonder how much it will effect the PVR/layover time on these services, as they may include shorter breaks for the drivers and more/less buses may be needed.

In addition, if the whole of "North Bridge Street" is closed on the evenings it may make it much harder for the buses to get to and from the depot.

The whole area, like the road and the roundabout/bridge should be done soon, leaving only the square left... i'm hoping they open both roads, including the new road leading to the car park while still working on the new square... and not waiting till the square is done to open it fully..


Ooo Friend, Bus Friend.