Northern (Arriva Rail North)
#21
RE: Northern Rail
New Northern Rail timetables come into force from Sunday 19 May across the regions routes. Having had a quick skim through, I don't believe there are any changes to times between Newcastle, Heworth and Sunderland; but if I find that there are, then the sites Metro timetable will be updated accordingly.

http://www.northernrail.org/travel/timetables

#22
RE: Northern Rail
Quote:New Northern Rail timetables come into force from Sunday 19 May across the regions routes. Having had a quick skim through, I don't believe there are any changes to times between Newcastle, Heworth and Sunderland; but if I find that there are, then the sites Metro timetable will be updated accordingly.

http://www.northernrail.org/travel/timetables

Having had a more in-depth read, there are minor changes to times between Newcastle, Heworth and Sunderland. A small number of journey's are revised to operate one minute earlier or later.

[attachment=4435]
[attachment=4441]

[attachment=4437]
[attachment=4438]

[attachment=4439]
[attachment=4442]

The information in these timetables is provided in good faith and should be checked on nexus.org.uk prior to travel.



In addition to the Tyne and Wear Metro replacement bus service being provided tomorrow (19 May) between Gateshead Stadium and Hebburn/Brockley Whins, there will be a Rail replacement bus service operating between Sunderland and Newcastle -

Quote:Northern Rail between Sunderland and - Tyne And Wear
16th May 2013 6:54pm
Advance Warning - Replacement bus service running on Northern Rail between Sunderland and Newcastle due to engineering works. Buses replace trains on Sunday before 13:30. Until 13:30 on 19th May.

Source - Sun FM http://www.sun-fm.com/sunderlandtraffic.php


Bus replacement timetable -
[attachment=4434]

Source - Northern Rail http://www.northernrail.org/

#23
RE: Northern Rail
Delays of approx. 10 to 15 mins.

Attached Files
File size: 109 KB
Downloads: 22


#24
RE: Northern Rail
A member of staff has just handed out a form to those who didn't board/alight at Sunderland so that they can claim for a refund.
I believe I overheard something about passengers having to change trains at some point soon also, though I'm not sure on that one.

EDIT: Make that 1hr 20m... Something happened to the previous one too.

Attached Files
File size: 214.55 KB
Downloads: 27


#25
RE: Northern Rail
According to the CrossCountry app, the 15:30 from Sunderland is on time and at Billingham currently.
Must have been cleared.

However the GrandCentral from Sunderland due out at 14.06 is 50 mins late - guessing that was stuck earlier on heading North or it may be late for totally unrelated issues...

#26
RE: Northern Rail
(30 Aug 2013, 2:03 pm)Daniel Wrote: A member of staff has just handed out a form to those who didn't board/alight at Sunderland so that they can claim for a refund.
I believe I overheard something about passengers having to change trains at some point soon also, though I'm not sure on that one.

EDIT: Make that 1hr 20m... Something happened to the previous one too.

2N31 arrived Sunderland 1350 and left 1352, 22 late then terminated at Newcastle. The previous service (2N27) terminated at Seaham.

Forum Moderator   | Let us know if you have any issues

Now working for Coatham Coaches


#27
RE: Northern Rail
(30 Aug 2013, 2:51 pm)Andreos1 Wrote: According to the CrossCountry app, the 15:30 from Sunderland is on time and at Billingham currently.
Must have been cleared.

However the GrandCentral from Sunderland due out at 14.06 is 50 mins late - guessing that was stuck earlier on heading North or it may be late for totally unrelated issues...

They use the 1450 arrival from London to do the 1406 departure, all down to issues with the 180s...

Forum Moderator   | Let us know if you have any issues

Now working for Coatham Coaches


#28
RE: Northern Rail
Have sent Dan a PM with more detail as I was on 2N31 and 2N27.

Basically signal failure 2N27 copped a 1 hr 25 delay, 2N31 just 25 mins.
Both terminated at Newcastle
2N27 and 2N31 actually coupled up at Ryhope to continue to Newcastle

#29
RE: Northern Rail
Was hoping to find a MoTrain today but had no luck. Have noticed however that there are Nexus logos on board a Class 142... Does anyone know how long these have been on board for?

Attached Files
File size: 2.35 MB
Downloads: 34


#30
RE: Northern Rail
(02 Nov 2013, 3:50 pm)Dan Wrote: Was hoping to find a MoTrain today but had no luck. Have noticed however that there are Nexus logos on board a Class 142... Does anyone know how long these have been on board for?

They have been on a while.
Not sure how long, but have noticed them in the past (glass divider between doors and seats).

If it was recent, I'd hazard a guess the stylised R logo would have been used.
'Illegitimis non carborundum'

#31
Re: RE: Northern Rail
(02 Nov 2013, 3:50 pm)Dan Wrote: Was hoping to find a MoTrain today but had no luck. Have noticed however that there are Nexus logos on board a Class 142... Does anyone know how long these have been on board for?

I would love to see a bus sprout a 'tache Wink

#32
RE: Northern Rail
Quote:Northern Rail @northernrailorg 48s
Due to a broken down train between #Manors and #Heworth services running through these stations may be cancelled or delayed at short notice

Just spotted this on twitter.
'Illegitimis non carborundum'

#33
RE: Northern Rail
Posted on Twitter a little while ago.

Attached Files
File size: 133.89 KB
Downloads: 26


#34
RE: Northern Rail
Probably worth mentioning that from the December 2013 timetable change (Sunday 8th) Dunston will see hourly calls on the Newcastle-Metrocentre shuttle services.

Forum Moderator   | Let us know if you have any issues

Now working for Coatham Coaches


#35
RE: Northern Rail
(02 Nov 2013, 3:50 pm)Dan Wrote: Was hoping to find a MoTrain today but had no luck.

156463 noted as a MoTrain today!

#36
RE: Northern Rail
Issues affecting services into and out of Sunderland this morning

www.nationalrail.co.uk/service_disruptions/61448.aspx
'Illegitimis non carborundum'

#37
RE: Northern Rail
(13 Nov 2013, 11:18 am)andreos1 Wrote: Issues affecting services into and out of Sunderland this morning

www.nationalrail.co.uk/service_disruptions/61448.aspx

Due to 10 miles of signalling cable being damaged by an RHTT overnight I understand!

Forum Moderator   | Let us know if you have any issues

Now working for Coatham Coaches


#38
RE: Northern Rail
(13 Nov 2013, 12:42 pm)tyresmoke Wrote: Due to 10 miles of signalling cable being damaged by an RHTT overnight I understand!

That was nice of them!
Heard rumours, but nothing concrete or to that extent
'Illegitimis non carborundum'

#39
RE: Northern Rail
www.bbc.co.uk/news/uk-england-cumbria-25358254

A piece on the Settle - Carlisle line.
One I have never been on, but would like to.
'Illegitimis non carborundum'

#40
RE: Northern Rail
(02 Nov 2013, 4:04 pm)andreos1 Wrote: They have been on a while.
Not sure how long, but have noticed them in the past (glass divider between doors and seats).

If it was recent, I'd hazard a guess the stylised R logo would have been used.

Sorry to reply to an ancient post. The Nexus logo has been there at least 10 years possibly 15. They were put on the Heaton allocated units when Arriva / Northern Spirit refurbed them from the bench seats to the high backed seats they now have. It was about the same time as the old PTE livery was lost replaced by the Northern Spirit livery and Nexus logo on the outside