You need to enable JavaScript to run this app.

Skip to main content

Northern (Arriva Rail North)

RE: Northern (Arriva Rail North)
(01 Apr 2017, 9:03 pm)S813 FVK wrote 156471 in the new livery: https://www.flickr.com/photos/nebp2/3362...otostream/

156444 is now in the new livery too, both of which were on Saltburn runs today.
[Image: 33886549841_3f97b0515a.jpg]Northern: 156444 by Matthew Jimmison, on Flickr
RE: Northern (Arriva Rail North)
(15 Apr 2017, 5:54 pm)S813 FVK wrote 150275 is another unit repainted:
https://www.flickr.com/photos/nebp2/3324...ateposted/

It looks like it has a new style of light clusters at the front.

Aircraft flown on:

744, 77W, 772, E145, E190, E170, E175, E195, A319, A320, A320NEO, A321, A321NEO, A330-200, A330-300, A340-600 763, 752, 733, 737, 738, CRJ900, CRJ1000
Favourite aircraft: G-STBL/G-ZBKL

RE: Northern (Arriva Rail North)
158842 is currently in the North East for a C Exam at Heaton, And should be leaving on Friday/Saturday.

Talking about 158's, Its rumoured the first one could be up here as soon as September for Familiarisation.

And anyone who rides 142079 for the rest of its working life will find that it had a Engine Replacement helped out/assembled by me while on Work Experience, Only for me to help out on a B Exam on it the next day! Don't worry, Everything was bolted together tightly.... Wink
My New Flickr https://www.flickr.com/photos/140662069@N02/ - Posts every Weekend at the minimum Smile
RE: Northern (Arriva Rail North)
(09 May 2017, 5:27 pm)South Tyne Lad wrote 158842 is currently in the North East for a C Exam at Heaton, And should be leaving on Friday/Saturday.

Talking about 158's, Its rumoured the first one could be up here as soon as September for Familiarisation.

And anyone who rides 142079 for the rest of its working life will find that it had a Engine Replacement helped out/assembled by me while on Work Experience, Only for me to help out on a B Exam on it the next day! Don't worry, Everything was bolted together tightly.... Wink
What are the 158s replacing!

Also what is when is replacing the 142s on the Bishop line!
RE: Northern (Arriva Rail North)
Strike action is planned for Tuesday 30 May.

We will do our best to keep you on the move. However, we will be operating a reduced service and expect all services to be busy. Customers are advised to give themselves more time to travel and to consider whether their journey is necessary.
Ooo Friend, Bus Friend.
RE: Northern (Arriva Rail North)
(09 May 2017, 7:37 pm)pdiddy wrote What are the 158s replacing!

Also what is when is replacing the 142s on the Bishop line!

Just noticed this

158's will be coming in New Northern Connect Spec for the merging of the current 1x Hour Newcastle-Carlisle Service with a new Semi-Fast express Service to Middlesbrough via the ECML calling at Chester-Le-Street,Durham and onwards to Middlesbrough via the Stillington Line at Ferryhill, There will continue to be a 1x Hour Middlesbrough/Nunthorpe via Durham Coast Service and the Hexham short will continue to Carlisle forming a Half Hourly Service.

Last 142's should be leaving by 3rd Quarter 2019, So basically late Summer/ Autumn time.
My New Flickr https://www.flickr.com/photos/140662069@N02/ - Posts every Weekend at the minimum Smile
RE: Northern (Arriva Rail North)
(18 Aug 2017, 1:33 am)markydh wrote Never. The plan is still to run the Carlisle - Newcastle - Middlesbrough Northern Connect via Durham.

Yes, Not the full Durham Coast. But I believe a additional Metrocentre/Newcastle/Heworth/Sunderland service is still in the pipeline, Probably by extending one of the shuttles, Was numbered "TW1" in the document.
While at Heaton I was in a conversation with a two high up's while on my break and that there was potential for a North East-York stopping service, More likely if the full reopening of the Leamside get's the go ahead, With it being " Not too long away "  Of course this could just be speculation, But with the man that mentioned it being pretty high up, They could be some truth in it....
My New Flickr https://www.flickr.com/photos/140662069@N02/ - Posts every Weekend at the minimum Smile
RE: Northern (Arriva Rail North)
Track access applications for the May 2018 timetable change have been submitted. Major changes in the North East include: -

* Extension of Hexham terminators to Carlisle. The service pattern will now (mostly) be Carlisle - Middlesbrough and Carlisle to Morpeth.

* More weekday evening services on the Morpeth - Metrocentre and Newcastle - Middlesbrough routes.

* Extension of some Whitby services to Newcastle and Carlisle.
RE: Northern (Arriva Rail North)
Between the 6 and 14 January a major track renewal project will take place near Newcastle station. This involves the closure of a bridge and a reduction in the number of trains that can enter Newcastle station from the South.

Northern services will be affected by this work. Trains between Newcastle and the Metrocentre will be replaced by buses.

Full timetables will be available to download here 2 weeks prior to the start of the work. Individual train times are already available at nationalrail.co.uk
Ooo Friend, Bus Friend.
RE: Northern (Arriva Rail North)
(18 Nov 2017, 10:07 am)Michael wrote Between the 6 and 14 January a major track renewal project will take place near Newcastle station. This involves the closure of a bridge and a reduction in the number of trains that can enter Newcastle station from the South.

Northern services will be affected by this work. Trains between Newcastle and the Metrocentre will be replaced by buses.

Full timetables will be available to download here 2 weeks prior to the start of the work. Individual train times are already available at nationalrail.co.uk

More info has appeared on the Northumberland County Council site:
.png northern 1.png
.png northern 2.png
.png northern 3.png
Ooo Friend, Bus Friend.
RE: Northern (Arriva Rail North)
When the new connect service starts between Boro - Durham - Carlisle with 158s ... is this going via Darlo (non stop)

Also what is happening to trains from Nunthorpe and Boro via Sunderland, Are these all only going as far as Metrocentre or Newcastle?

When are these changes due to take place ?
Marxista Fozzski
RE: Northern (Arriva Rail North)
I know it is used as a Diversion for the ECML when a blockade is in effect, but is the Stillington Line up to scratch for a full passenger service on the line, shame the Leamside could not be re-opened...A Leamside and Stillington full passenger and freight service could surely free up paths on the ECML between Newcastle and Northallerton and free some space on the Durham Coast line.

Out of interest whats happening with the Blyth and Tyne, will that ever has passenger services re-instated as people have campaigned for donkeys years to have it reopened

Sent from my SM-G950F using Tapatalk
RE: Northern (Arriva Rail North)
Transport Focus are out and about today. Handing out leaflets for the latest train survey.

Having murdunoC stylee issues this afternoon, so unable to add photo
'Illegitimis non carborundum'
RE: Northern (Arriva Rail North)
(26 Feb 2018, 4:37 pm)TEN 6083 wrote Sunderland MP ‘disappointed’ that new trains will not run through city

https://www.sunderlandecho.com/news/tran...-1-9033769


Sent from my iPhone 7+ using Tapatalk

Sunderland ,Hartlepool and middlesbrough line has for decades been the poor relations to Newcastle area,regarding dmuunits.while the old pacers are going shortly,you have to give them some tribute.these units were a cheap build by BR  in the 80s.they were supposed to be a stop gap if I remember correctly,after getting rid of the first generation dmus. pacers were built to last 15-20 years at most. Because they are still running today, bears some testament to the trains themselves.the depot staff have to be recognised for their skills at keeping these trains on the rails way past their working life date.while some will be sorry to see these units go,the majority will welcome their demise.while class 158/156 dmus are a slight step up on the pacers,it is a disgrace that the seaham coast line will not get better ,newer trains, as these units were built I think in the early 90s.
RE: Northern (Arriva Rail North)
(07 Apr 2018, 1:29 pm)Andreos1 wrote Transport Focus are out and about today. Handing out leaflets for the latest train survey.

Having murdunoC stylee issues this afternoon, so unable to add photo

Front page of the survey.
.jpg WP_20180407_11_29_57_Pro.jpg
'Illegitimis non carborundum'