RE: Go North East: Latest News & Discussion - December 2017
(30 Dec 2017, 4:33 pm)cbma06 wrote The 20 going the same way with these streetlites and the extension to shields, already some deptford drivers are saying that there’s been loads of reliability problems on the Durham section due to the extension to shields, and some drivers are saying that the 56 has been losing patronage over the past year.
The 20 doesn't seem to be too bad Durham end, reliability wise. Its got a huge layover, and has become common sight to see one go on the back wall layover at Durham, as soon as the previous one pulls onto the stand. The only issue you tend to see is around the 1600-1800 peak.
In my opinion, the new lights and Leazes Bowl works in Durham have made a big difference, but there is absolutely nothing you can do beyond that to cope with the peak time volume of traffic. Durham has for a long time, and will continue to bottleneck, until both North AND South bypasses are designed, funded and built... I can't see that happening anytime soon, but lets see what the County plan brings...