(06 May 2015, 4:40 pm)DaveyBowyer wrote I think the problem with the X21 is this:
- Lack of suitable vehicles (e.g 7501 - 7509)
- De-Tour via Neddderton adding time onto the journey.
- Far more incentive to either get a 35 to North Seaton then jump on the X20 straight to Newcastle if living in Newbiggin.
- X20 can complete the journey from Ashington to Newcastle much quicker.
- X22 is more reliable and faster on the section between Bedlington and Newcastle improving punctuality and reliability.
- Too much focus on 'eco nonsense' rather than setting up the vehicles to ensure enough power is maintained for all speeds.
- Small number of drivers making no safe or legal effort to keep as close to time as possible.
- Lack of consistency.
Arriva need to do the following:
- Get rid of 7501 - 7509 and buy new buses (either more ADL E400s setup correctly with no ecnospeed or alternatively, Scania N230UD E400s with ecnospeed and setup for economy and efficiency).
- Either re-route the X21 via the X22 route between Bedlington and Newcastle (making the combined frequency every 9-11 minutes from Ashington and between Bedlington and Newcastle with small timing adjustments on both services) with another route serving Nedderton OR, bring back the X31 / X32 under the Sapphire brand with 11x ADL E400s and X33 under MAX brand with 5 VDL Pulsars.
- Enforce high standards of driving ensuring that all drivers drive safely and as quickly as possible according to the road, traffic and weather conditions.
I would just bin 7501-7509. I'd get rid of the EcoNOspeed system rubbish from all buses. Buy new buses.
OR I'd leave it as it is and let the X21/X22 die a death.