(15 Sep 2013, 5:30 pm)Michael wrote Wonder what option's people would of had if the 20/35 changes went ahead as GNE wanted them to.
Such as the 20 extending to South Shields - replacing the 35 - route would of taken 88 mins - PVR would of being 18 - if kept at every 10 mins.
35 - i think was run from Park lane to South Moosley etc only- remaining 10 mins - this could of being spilt.
It would have been interesting to say the least, considering the reliability of the Solars on the 20 as of late. It was an insane suggestion by them to have such an unrealistic route. Durham already has a 30 minute frequency to Shields and I can't see it needing more than that!