(28 Jul 2016, 9:34 pm)Ds1197 wrote Are Stagecoach South Shields doing anything to sort out the delays on 10/11
They cant, Its a Nexus Contract so Nexus sort out the timetable's. And also because it's a tendered contract, It's ran with the smallest PVR possible with a very small layover to save money.