(28 Jul 2016, 9:38 pm)South Tyne Lad wrote They cant, Its a Nexus Contract so Nexus sort out the timetable's. And also because it's a tendered contract, It's ran with the smallest PVR possible with a very small layover to save money.
But it's not just the 10/11. The 30 interworks with 10 and 11 and then there is the X20 also. So quite a chunk affected. It will have to be looked at eventually