(12 Sep 2019, 4:20 pm)streetdeckfan wrote What I'm saying is having 2 different batches is better than 3 different batches.Colours aside, they're more or less the same (high) specification...
I personally think having 2 batches on the Red Kites would be less of an issue because there are 3 different services, but with the X21, there'll be 3 different batches spread around only 8 buses!
I'm not opposed to having 2 batches, but 3 is too much imo.
I don't think Joe Bloggs travelling on the X21 will care too much that one bus has the GNE logo embossed into it, and one has the GNE logo stitched.
Sent from my SM-G960F using Tapatalk