(07 Jan 2014, 10:29 am)Greg in Weardale wrote What a pathetic, pointless service the new X3 is. Which lunatic would design a timetable like that? Three Saturday journeys run only from Newcastle to not even the edge of Fulwell where the Newcastle Road joins the Shields Road. Last Mon - Fri run to Newcastle is lunchtime and there's a journey from Monkwearmouth at 09.19 so biddy passes can't use it. It is MENTAL and the company should be ashamed. The rot which set in 18 months or so ago in the design of their services and timetables is spreading.
So if the X3 is Pathetic and Pointless, What is your opinion on the 27X then, As I would think the Service Design is pretty the same.