(18 May 2022, 6:27 pm)V514DFT wrote Is there not a way where the 25/28s/29 could be merged
Don't think it's practical personally it'll be too long.
Extending some 21's would argubly be the best and cheapest solution for the 25 if they work together or it'll terminate at CLS with connections.
I can imagine some super route with the 25/82 doing the other half of the route with the 23 being binned off.
Then for 28/29 just the 28A being subsidised which will be an awfully long journey from Ouston but it's better than nothing. There's nothing down Saltwell Park etc either.