(19 May 2023, 9:53 pm)Ambassador wrote Yeah the X39 changes are causing no end of headaches staffing wise. The removal of the 4.30ish service and its replacement with a barely used 6pm run means everyone wants to leave the office by 4pm to catch the first X39.The 309 isn't that much longer than what it was pre March other than serving High Farm.
The extended journey times on the 309/7 are equally painful. Better service for residents but worse for commuters into Cobalt…hand gives and takes away
Thank our lucky stars the Silverlini / A19 flyover was completed before COVID as the Cobalt traffic used to be on par if not worse than the Metrocentre is around Xmas time