(23 Dec 2023, 11:41 am)Ambassador wrote 2025 is the likely date when Costain hand the site back over. Its being used as their main compound until then
when you say compound i would assume you meant the area opposite the angel of the north pub on longbank but i've been told its actually the other side of the A1, the birtley side and P&R will be expected to cross thr a167 at the" new" traffic lights recently installed and wait for 3 x 21s to turn up at the smae time?