You need to enable JavaScript to run this app.

Skip to main content

Reintroduction of Temporarily Reduced Services Back to Original Frequency

Reintroduction of Temporarily Reduced Services Back to Original Frequency

RE: Reintroduction of Temporarily Reduced Services Back to Original Frequency
(22 Jan 2024, 10:41 pm)Storx wrote I've always thought that the 19 should go through the tunnel vs to North Shields, the buses are almost always dead and there's already Cobalt to North Shields links anyway with the 310/353/354

Probably the best thing you could do is send the 9 through the tunnel to Percy Main and extend it onto the 19 through to Cramlington, obviously you'd have to break the interworking of the 9/5/24 though but it would open loads of areas to Cobalt, and if you did need to go to Nissan you could always change onto the 50 at Boldon.



Yeah let's hope to be honest. Mind not sure Arriva would be too happy for obvious reasons.

I've always wanted the 9 to return to North Shields but with the 10/11 now going to the hub. Don't know how stagecoach would take it. 

Reading through old timetables showed the 5 to Wallsend & the 9 to North Shields. Them were the days. Don't think we will ever see that

RE: Reintroduction of Temporarily Reduced Services Back to Original Frequency