(12 Jul 2024, 1:52 pm)Michael wrote I edited my post, as you were replying.
If it was to end at Newcastle, the PVR would drop to 4, if the route was: Newcastle - Quayside - St Peters Basin - Wallsend - every 20 mins
Leaves 5 spare branded buses - they would need to be allocated to a Riverside route anyway - I would say the 57 could be in with a shout.
Just thinking out loud here but what if they merged the 57 with the Q3? Would mean the 57 would be branded again and the quay city name would still mean something ypu know, considering half the city part’s been dropped. Although the PVR probably wouldn’t be in favour it’s something they could try.