(29 Aug 2024, 9:59 pm)ReDemPTiion wrote Yeah cos it’s walkergates E200’s heading to Stockton as Slatyford need their E200’s for the 32/32A. 26291/293 came to Slatyford, Slatyford sent 27253/254 to Walkergate, Walkergate sent 37314/316 to Stockton and I’m guessing 37312/315 will be leaving Walkergate for Stockton, 26290/292 will go to Slatyford and 27251/252 will go to Walkergate
So what will Slatyford be gaining for their PVR increase?
Since Walkergate have already gained 6 additional E400MMCs I was under the impression 3 were for the increased PVR on the 1 and the other 3 would replace the E200s allowing Slatyford to gain 3 E200MMCs for the increase on the 30/31/36