(03 Nov 2024, 6:55 pm)Storx wrote Interesting to see that it was the above with the X9 running completely standalone.
I assume that this is going to be the long term answer for the electric problem with the X9 moving to Ashington, in return for the 43/44/45 boards going to Blyth? It would make sense since Bebside is the closest you can get to Ashington from anything else from the depot.
It's pretty much certain it's working by itself during the week, bar maybe the evening peak.
It would seem pretty inconvenient for Ashington to operate the X9, there'd likely need to be remote reliefs for each break and there are no other services which it could realistically interwork with.