RE: Go North East: Service Suggestions v2
road Sorry if this is a bit off topic but the q3 is absolutely awful it takes so long and ends up so late at this point i think it should just remove all routes via jesmond and make them go through Newgate street(because the traffic through John Dobson street is mad) and then into the quayside as currently it is absolutely awful and make most of the buses from Mon-Fri go to wallsend.I get on the q3 everyday and the same thing keeps happening ut has never ever been on time it is always 10-15 mins late.there needs to be something done about it!!