(17 Apr 2014, 12:05 pm)JP6004 wrote Or long base versas as the citylink examples are coping well
Maybe but you have to think about the route, the Lime is both long based routes, with banks and that, could they cope also looking at the current routes, by going one way they take:
8 - 82 mins
78/78A - 107 mins
as where the 58 takes 73 mins (full route)
Not sure they would cope
(Please let me know if my numbers are wrong XD)