(17 Apr 2014, 6:09 pm)Marcus wrote Then all 3 main operators will have a go on it. When you think about it, wouldn't that mean a lot of jobs with Go North East would be lost? Would Arriva use their own drivers? Or, would they be transferred to Arriva? (like they did with the Hexham swaps?)
He's talking about the Durham Park & Ride contract first and foremost.