(31 Aug 2014, 7:41 pm)tyresmoke wrote Darlington can yes, as they have had them in the past (7514-21 for the 1/1B) - the loadings is part of the issue why we've added an additional journey into Durham on a morning, and return on an evening for the college students. I know the current 0810 arrival in Durham can just be handled by a Pulsar and of course the extra journey will now run 15 mins behind this trip which should split the loadings a fair bit, which can only help. If there are any specific issues happening every day then PM me and let me know...
Why can't Durham run it by themselves? Or am I missing something obvious?
If it is down to the timetable, surely something can be done.
I often see the 8.10 arrival into Durham and it is generally full in term times.
Noticed a difference once the holidays kicked in.