(24 Sep 2014, 12:48 pm)Andreos1 wrote Sorry to keep harping on about this. Sad as it sounds, I find the whole set up for the service quite interesting.
Yeah, I get the varying shift patterns - but if a car park is full for the majority of the day from early morning, the chances of it emptying enough to justify a decker operating every 15mins, is slim to nil.
The fact the 35a can leave Rainton Bridge carrying nowt but the driver (operating a 20min frequency) and the 20a can whizz through and not stop at all - ditto the the 923, tells me all there is to know about shift patterns and demands for public transport over the course of the day.
However, to turn this into a positive!
Demand for P&R will be higher today than previously - if only because of the huge crane parked outside NPower, offering bungee jumps. Not sure how many car parking spaces that is taking up, but it is a few!
The Rainton car park is going to become car share only, so non car share drivers will need to use the Park & Ride sites, so far though it's the 7am to 8am from Chilton Moor and 4pm return buses from that carry the loads. I'm sure the bus sizes will be adjusted once the initial period has expired, time will tell