Rate Thread
  • 1 Vote(s) - 2 Average
  • 1
  • 2
  • 3
  • 4
  • 5
|
Stagecoach North East: Upcoming Service Changes
06 Jul 2015, 4:28 pm,
Post: #121
Stagecoach North East: Upcoming Service Changes
PHP
PB0001987/21 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Stockton High Street and Stockton High Street given service number 58 effective from 01-Sep-2015. To amend Timetable.


PB0001987/23 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Middlesbrough Bus Station and Coulby Newham given service number 12 effective from 01-Sep-2015. To amend Timetable.


PB0001987/207 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Stockton and Elton Park given service number 61 effective from 01-Sep-2015. To amend Timetable.


PB0001987/220 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Middlesbrough Bus Station and Billingham Low Grange given service number 34 effective from 01-Sep-2015. To amend Timetable.


PB0001987/297 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Park End and Middlesbrough Bus Station given service number 39 effective from 01-Sep-2015. To amend Timetable
Reply
06 Jul 2015, 4:40 pm,
Post: #122
RE: Stagecoach North East: Upcoming Service Changes
(06 Jul 2015, 8:40 am)Jimmi wrote PB0002404/1 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ

Variation Accepted: Operating between Slatyford and Four Lane Ends given service number 1 effective from 06-Sep-2015. To amend Timetable.

That will be an extension to Buddle Road for the university students, as from today it's only going to Slatyford.
Reply
06 Jul 2015, 4:59 pm,
Post: #123
RE: Stagecoach North East: Upcoming Service Changes
(06 Jul 2015, 4:28 pm)Jimmi wrote
PHP
PB0001987/21 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Stockton High Street and Stockton High Street given service number 58 effective from 01-Sep-2015. To amend Timetable.


PB0001987/23 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Middlesbrough Bus Station and Coulby Newham given service number 12 effective from 01-Sep-2015. To amend Timetable.


PB0001987/207 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Stockton and Elton Park given service number 61 effective from 01-Sep-2015. To amend Timetable.


PB0001987/220 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Middlesbrough Bus Station and Billingham Low Grange given service number 34 effective from 01-Sep-2015. To amend Timetable.


PB0001987/297 CLEVELAND TRANSIT LTD T/A STAGECOACH NORTHEASTENGINEERING DEPARTMENTNORTH BRIDGE STREETSUNDERLANDSR5 1AQ

Variation Accepted
Operating between Park End and Middlesbrough Bus Station given service number 39 effective from 01-Sep-2015. To amend Timetable

Are Stagecoach making up for the lack of service changes in North Sunderland by implementing more on Teesside?

Hopefully just a diversion (although a distinct lack of "route amendment" on the registration), rather than another set of changes...
Reply
06 Jul 2015, 5:16 pm,
Post: #124
RE: Stagecoach North East: Upcoming Service Changes
The 'think-he-knows-it-all' knows what the main aim of this change is.

The interworking of the 12 and 39 hasn't turned out to be the best idea ever. As such, from September, they will no longer interworking during the Monday to Saturday daytime. The 39s will additionally be given more running time more inkeeping with the 20mph speed limit down Overdale Road in Park End that was introduced back in 2012 and yet no more time was added then (to put things into perspective - the 39 running time is exactly the same as the 36/37/38 had back in 2002 when all 3 terminated at Overdale Road End (and the 38 had a variation the 38C))
Reply
01 Aug 2015, 8:55 am,
Post: #125
RE: Stagecoach North East: Upcoming Service Changes
Details of Teesside changes now on the website:  https://www.stagecoachbus.com/tis-servic...px?id=6357
Reply
01 Aug 2015, 5:57 pm,
Post: #126
RE: Stagecoach North East: Upcoming Service Changes
(01 Aug 2015, 8:55 am)JakeSavage wrote Details of Teesside changes now on the website:  https://www.stagecoachbus.com/tis-servic...px?id=6357

Liking the new early morning service 61 giving me a lovely early bus to the town! Thank you  Wink You know who you are!

Forum Moderator   | Let us know if you have any issues

Service Manager, Coatham Connect

Reply
04 Aug 2015, 7:36 am,
Post: #127
RE: Stagecoach North East: Upcoming Service Changes
(01 Aug 2015, 5:57 pm)tyresmoke wrote Liking the new early morning service 61 giving me a lovely early bus to the town! Thank you  Wink You know who you are!

I wouldn't be getting hopes up of anything 'decent' turning up on there for the first few weeks - I reckon it will be on the front of the early weekday 58 turn (0614 arrival opposite the Castlegate is exactly the time the first 58 is due to depart) so ALX300s for the first couple of weeks.

As for the other changes:
39 gains an extra bus (PVR 5). 6 minutes in the bus station between trips during the 9 minute frequency operation plus 2 minutes at Park End from 8am until the evening times come into effect.
12 appear to be back to the standalone pattern of this time 3 years ago (8 buses). Now there's 3 buses that get a 6 minutes layover at Coulby Newham prior to the afternoon peak starting but only 1 gets the 11 minutes most get at present.
Reply
04 Aug 2015, 9:22 am,
Post: #128
RE: Stagecoach North East: Upcoming Service Changes
(04 Aug 2015, 7:36 am)Kuyoyo wrote I wouldn't be getting hopes up of anything 'decent' turning up on there for the first few weeks - I reckon it will be on the front of the early weekday 58 turn (0614 arrival opposite the Castlegate is exactly the time the first 58 is due to depart) so ALX300s for the first couple of weeks.

As for the other changes:
39 gains an extra bus (PVR 5). 6 minutes in the bus station between trips during the 9 minute frequency operation plus 2 minutes at Park End from 8am until the evening times come into effect.
12 appear to be back to the standalone pattern of this time 3 years ago (8 buses). Now there's 3 buses that get a 6 minutes layover at Coulby Newham prior to the afternoon peak starting but only 1 gets the 11 minutes most get at present.

Don't think he'll be bothered what turns up so long as he's got a bus.
Reply
14 Aug 2015, 5:24 pm,
Post: #129
RE: Stagecoach North East: Upcoming Service Changes
Special bus services on Great North Run Day

https://www.stagecoachbus.com/tis-servic...px?id=2766
Ooo Friend, Bus Friend.
Reply
01 Sep 2015, 1:15 pm,
Post: #130
RE: Stagecoach North East: Upcoming Service Changes
B0002404/27 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Freeman Hospital and Central Station or Metrocentre given service number 6/7/8 effective from 25-Oct-2015. To amend Route and Timetable.

PB0002404/89 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Newcastle, Pilgrim Street and Horsley Hill given service number X34 effective from 26-Oct-2015. To amend Timetable.
Ooo Friend, Bus Friend.
Reply
01 Sep 2015, 8:06 pm,
Post: #131
RE: Stagecoach North East: Upcoming Service Changes
(01 Sep 2015, 1:15 pm)Michael wrote PB0002404/89 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Newcastle, Pilgrim Street and Horsley Hill given service number X34 effective from 26-Oct-2015. To amend Timetable.

Monday 26th October is the School/College Half Term Holiday week. I assume this is when the X34 frequency will be increased to every 20 minutes; as it was usually mid-November when the pre-Christmas Sunday Service was introduced. If the X34 is permanently becoming a 20 minute frequency, I would assume a half-hourly Sunday service will permanently be introduced. I also think they should put more buses on an evening after 19:00 - as I think they run hourly past that time up until 21:30.
Reply
01 Sep 2015, 8:46 pm,
Post: #132
RE: Stagecoach North East: Upcoming Service Changes
(01 Sep 2015, 8:06 pm)AIG20 wrote Monday 26th October is the School/College Half Term Holiday week. I assume this is when the X34 frequency will be increased to every 20 minutes; as it was usually mid-November when the pre-Christmas Sunday Service was introduced. If the X34 is permanently becoming a 20 minute frequency, I would assume a half-hourly Sunday service will permanently be introduced. I also think they should put more buses on an evening after 19:00 - as I think they run hourly past that time up until 21:30.

Its not even hourly. It is 1820 1915 and 2030 from Newcastle.  Heading towards Newcastle is worse that is something like 1600 1630 1830 and nothing else. The evening journeys have improved with passengers numbers and hopefully will maintain. Yes Sunday journeys need to operate all year round as since thus service started it has shown immense growth. Remember originally it commenced with high floor darts 32791-93 and terminated at Haymarket bus station. What luxury we passengers had back then waiting for the bus. Now we endure the open air of pilgrim street but have luxury of sitting upstairs and utilising the free WiFi.
Reply
02 Sep 2015, 8:00 am,
Post: #133
RE: Stagecoach North East: Upcoming Service Changes
I hope so, i think the service deserves to be every 20 minutes, hopefully a regular Sunday service to.

Question is though... will the remaining E400's be ready in time Angel Angel Angel  (we know how long they've took so far Wink
Ooo Friend, Bus Friend.
Reply
03 Sep 2015, 9:49 am,
Post: #134
RE: Stagecoach North East: Upcoming Service Changes
Temporary closure of Belvedere Road roundabout, affecting Service 23

On Sunday 06 September 2015, Sunderland City Council will need to close Belvedere Road roundabout for resurfacing works

Last Updated: 02 September 2015 2:34 PM

On Sunday 06 September 2015, Sunderland City Council will need to close Belvedere Road roundabout for resurfacing works.

The works will require the closure of the whole roundabout, so there will be no access to the adjoining roads.

During the closure periods, Services 23 will be required to divert along Burn Park Road and Durham Road, rejoining original route. The 23 will also complete this in the opposite direction.

Clearly, whilst we will be attempting to operate Service 23 in accordance with published timetables, there is nonetheless the potential that some trips may be subject to delay.

Stagecoach would like to apologise for any inconvenience these works may cause, and we remain grateful for customers’ patience and understanding.
Ooo Friend, Bus Friend.
Reply
03 Sep 2015, 11:05 am,
Post: #135
RE: Stagecoach North East: Upcoming Service Changes
(03 Sep 2015, 10:59 am)lost3 wrote Really interesting stuff.

What has this got to do with upcoming service changes for Stagecoach North East
Reply
03 Sep 2015, 3:34 pm,
Post: #136
RE: Stagecoach North East: Upcoming Service Changes
0002404/4 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Variation Accepted: Operating between Wallsend and Throckley given service number 22/22X effective from 25-Oct-2015. To amend Route and Timetable.
Ooo Friend, Bus Friend.
Reply
03 Sep 2015, 3:38 pm,
Post: #137
RE: Stagecoach North East: Upcoming Service Changes
(03 Sep 2015, 11:05 am)ifm001 wrote What has this got to do with upcoming service changes for Stagecoach North East

Well his account name has lost in it ........so I suppose he's/she's lost
My New Flickr https://www.flickr.com/photos/140662069@N02/ - Posts every Weekend at the minimum Smile
Reply
03 Sep 2015, 4:22 pm,
Post: #138
RE: Stagecoach North East: Upcoming Service Changes
(03 Sep 2015, 3:34 pm)Michael wrote 0002404/4 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ

Variation Accepted: Operating between Wallsend and Throckley given service number 22/22X effective from 25-Oct-2015. To amend Route and Timetable.

22X express via Monument no doubt.
Reply
09 Sep 2015, 7:14 am,
Post: #139
RE: Stagecoach North East: Upcoming Service Changes
PB0002404/308 - BUSWAYS TRAVEL SERVICES LTD T/A STAGECOACH NORTHEAST, ENGINEERING DEPARTMENT, NORTH BRIDGE STREET, SUNDERLAND, SR5 1AQ
Registration Accepted by SN
Starting Point: City Centre
Finish Point: Seaburn
Via:
Service Number: 101
Service Type: Normal Stopping
Effective Date: 26-SEP-2015
Other Details: Special service for Sunderland illuminations 2015 event, as requested by Sunderland City Council.
Ooo Friend, Bus Friend.
Reply
10 Sep 2015, 3:16 am,
Post: #140
RE: Stagecoach North East: Upcoming Service Changes
Seem to just carry fresh air last year!
Reply


Related Threads…
Thread Author Replies Views Last Post
  Stagecoach North East: Service Suggestions Michael 1025 487401 17 Apr 2024, 7:28 am
Last Post: Storx
  Stagecoach North East service levels during the Coronavirus (COVID-19) pandemic Kuyoyo 185 46359 27 Apr 2020, 7:00 pm
Last Post: scanialover