You need to enable JavaScript to run this app.

Skip to main content

Go North East: Upcoming Service Changes v2

Go North East: Upcoming Service Changes v2

RE: Go North East: Upcoming Service Changes v2

(16 Sep 2019, 10:05 am)Kuyoyo wrote PB0003954/1095 Registered
GO NORTH EAST LIMITED
Route: Newcastle, Market Street to Newcastle, Eldon Square
Service number: 97 (X97)
Service type: Normal Stopping
Effective date: 27 Oct 2019

PB0003954/1079 Registered
GO NORTH EAST LIMITED
Route: Sunderland to Peterlee
Service number: X6 (X7)
Service type: Limited Stop
Effective date: 27 Oct 2019

PB0003954/580 Registered
GO NORTH EAST LIMITED
Route: Whitley Bay, The Links to Metrocentre
Service number: 1 (1A,1B)
Service type: Normal Stopping
Effective date: 27 Oct 2019
Vary timetable

PB0003954/285 Registered
GO NORTH EAST LIMITED
Route: Newcastle Market Stree to Newcastle Market Street
Service number: 53 (54)
Service type: Normal Stopping
Effective date: 27 Oct 2019
Variation to timetable

PB0003954/86 Registered
GO NORTH EAST LIMITED
Route: Gateshead Metro to Gateshead Metro via Team Valley, Heworth
Service number: 93 (94)
Service type: Normal Stopping
Effective date: 27 Oct 2019
Vary route and timetable



this is because the 93/94 is going to every 20 Mins bar aat peak times when be more buses just been told today iof driver

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 10:56 am)jamjam9207 wrote



this is because the 93/94 is going to every 20 Mins bar aat peak times when be more buses just been told today iof driver


Hopefully they can operate the peak journeys in both directions at both am & pm...


RE: Go North East: Upcoming Service Changes v2
(10 Oct 2019, 11:45 am)S830OFT wrote

Hopefully they can operate the peak journeys in both directions at both am & pm...

I wouldnt think so, the 94s are always quiet at PM down to the valley.

If you're talking about full loops at peak times, then that would surely mean even more extra buses being added? The PM dupes are currently provided by split shift drivers off schools entirely, and only one uses a branded loop bus.
RE: Go North East: Upcoming Service Changes v2
(10 Oct 2019, 10:56 am)jamjam9207 wrote



this is because the 93/94 is going to every 20 Mins bar aat peak times when be more buses just been told today iof driver


New timetables online,it confirms the 93/94 going to every 20 minutes
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes v2
Think the loops are a complete waste of a B9TL if they ever get cascaded, this just further proves the point that they don't even justify a 15 minute service.
RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 2:14 pm)deanmachine wrote Think the loops are a complete waste of a B9TL if they ever get cascaded, this just further proves the point that they don't even justify a 15 minute service.


Waste of a B9? I would hardly say the ex-London ones are the best.


I think it depends what section of the route its on. The 94 is always busier on the way to the valley and felling rather than Heworth. The 93 always generally busier towards the QE and the valley as opposed to coming into Gateshead. Overall I think they have fairly decent loads and warrant a DD allocation if being reduced to every 20 minutes.


But I have always thought that the route into the retail park is a bit odd. It passes the entrance/ exit to the bus stop and gets stuck in traffic at the roundabout. Then loop back on to the roundabout to continue down the valley. Why not just use the other entrance to the retail park bus stop?

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 2:45 pm)JP6004 wrote


Waste of a B9? I would hardly say the ex-London ones are the best.


I think it depends what section of the route its on. The 94 is always busier on the way to the valley and felling rather than Heworth. The 93 always generally busier towards the QE and the valley as opposed to coming into Gateshead. Overall I think they have fairly decent loads and warrant a DD allocation if being reduced to every 20 minutes.


But I have always thought that the route into the retail park is a bit odd. It passes the entrance/ exit to the bus stop and gets stuck in traffic at the roundabout. Then loop back on to the roundabout to continue down the valley. Why not just use the other entrance to the retail park bus stop?



I must say, whenever I've been on The Loop (after all these years, I still can't remember which way is which!) during the day between Gateshead and Team Valley, it's been dead, maybe a handful of other people on but that's about it.


I've never understood the stops, surely it would be a lot more convenient for the bus to actually serve Retail World rather than having to walk miles (well, what feels like miles) to actually get to the shops

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 3:11 pm)streetdeckfan wrote


I must say, whenever I've been on The Loop (after all these years, I still can't remember which way is which!) during the day between Gateshead and Team Valley, it's been dead, maybe a handful of other people on but that's about it.


I've never understood the stops, surely it would be a lot more convenient for the bus to actually serve Retail World rather than having to walk miles (well, what feels like miles) to actually get to the shops



93 Heworth to Valley

94 Gateshead to Valley


I think it is largely to do with the shear amount of traffic heading into the retail park

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 2:45 pm)JP6004 wrote


Waste of a B9? I would hardly say the ex-London ones are the best.


I think it depends what section of the route its on. The 94 is always busier on the way to the valley and felling rather than Heworth. The 93 always generally busier towards the QE and the valley as opposed to coming into Gateshead. Overall I think they have fairly decent loads and warrant a DD allocation if being reduced to every 20 minutes.

But I have always thought that the route into the retail park is a bit odd. It passes the entrance/ exit to the bus stop and gets stuck in traffic at the roundabout. Then loop back on to the roundabout to continue down the valley. Why not just use the other entrance to the retail park bus stop?



Even if the 93 turned left prior to the roundabout and used the 'bus station', it would save time.


To be honest, I've no idea why the road behind Mothercare can't be adapted to suit the buses and make it bi-directional for the entire length.



(10 Oct 2019, 3:11 pm)streetdeckfan wrote


I must say, whenever I've been on The Loop (after all these years, I still can't remember which way is which!) during the day between Gateshead and Team Valley, it's been dead, maybe a handful of other people on but that's about it.

I've never understood the stops, surely it would be a lot more convenient for the bus to actually serve Retail World rather than having to walk miles (well, what feels like miles) to actually get to the shops



It used to stop on the main road outside Retail World, but was curtailed to its current route a while back, due to the traffic heading in and out.


The stop was just shy of where Mcdonalds is now, on the left hand side.

'Illegitimis non carborundum'
RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 4:38 pm)Andreos1 wrote

Even if the 93 turned left prior to the roundabout and used the 'bus station', it would save time.


To be honest, I've no idea why the road behind Mothercare can't be adapted to suit the buses and make it bi-directional for the entire length.





It used to stop on the main road outside Retail World, but was curtailed to its current route a while back, due to the traffic heading in and out.


The stop was just shy of where Mcdonalds is now, on the left hand side.



Yes there was a bus stop on the mothercare side but seems to be of taken away a while ago

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 2:45 pm)JP6004 wrote


Waste of a B9? I would hardly say the ex-London ones are the best.


I think it depends what section of the route its on. The 94 is always busier on the way to the valley and felling rather than Heworth. The 93 always generally busier towards the QE and the valley as opposed to coming into Gateshead. Overall I think they have fairly decent loads and warrant a DD allocation if being reduced to every 20 minutes.


But I have always thought that the route into the retail park is a bit odd. It passes the entrance/ exit to the bus stop and gets stuck in traffic at the roundabout. Then loop back on to the roundabout to continue down the valley. Why not just use the other entrance to the retail park bus stop?



I just think the 58 would be much more deserving of a 'Decker allocation than the Loops. That actually does get busy enough all through the day to warrant them. I've driven the Loops in the past, as well as used them in College and I've never had a full standing load, outside of 8-9am on the 94.

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 5:24 pm)deanmachine wrote


I just think the 58 would be much more deserving of a 'Decker allocation than the Loops. That actually does get busy enough all through the day to warrant them. I've driven the Loops in the past, as well as used them in College and I've never had a full standing load, outside of 8-9am on the 94.



Would be a bit of a downgrade to B9s. They aren't the nicest buses

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 5:38 pm)JP6004 wrote


Would be a bit of a downgrade to B9s. They aren't the nicest buses



I don't see how they're a downgrade from a Versa, not like they have USBs and e-Leather, I'd rather have a seat on a B9 then be a sardine on a "nicer" Versa.

RE: Go North East: Upcoming Service Changes v2

(10 Oct 2019, 3:11 pm)streetdeckfan wrote


I must say, whenever I've been on The Loop (after all these years, I still can't remember which way is which!) during the day between Gateshead and Team Valley, it's been dead, maybe a handful of other people on but that's about it.


I've never understood the stops, surely it would be a lot more convenient for the bus to actually serve Retail World rather than having to walk miles (well, what feels like miles) to actually get to the shops


It did used to stop at the edge of the car park, opposite where topps tiles is. (edit to acknowledge that other people have made the same point!)

RE: Go North East: Upcoming Service Changes v2
PB0003954/797 Registered (Short notice)
GO NORTH EAST LIMITED
Route: Easington Lane, High Street to Newcastle, Eldon Square Bus Station
Service number: X1 (X1A)
Service type: Limited Stop, Normal Stopping
Effective date: 03 Nov 2019

Variation applications


Anymore details on this?
Ooo Friend, Bus Friend.
6358
RE: Go North East: Upcoming Service Changes v2
Couple of changes from 3rd of November.

V9 re-routed to serve Elm Park (Shotley Bridge)

X5/X15 extended from Consett to Shotley Bridge & Benfieldside (X5 clockwise loop / X15 anti-clockwise loop) pvr increase to 4.

Changes on Vosa site for Lumier.
6358
RE: Go North East: Upcoming Service Changes v2

(24 Oct 2019, 4:34 pm)Arcticrossy92 wrote Any reason for the Extension to the X5/X15, is it replacing something, or is it something new because of increased Demand?


It’s mainly going on unserved roads so increasing ridership. Also with Shotley bridge hospital being pretty much empty of services, I’d guess there might be a demand from the areas being served.

RE: Go North East: Upcoming Service Changes v2
(24 Oct 2019, 5:25 am)Stanleyone wrote Couple of changes from 3rd of November.

V9 re-routed to serve Elm Park (Shotley Bridge)

X5/X15 extended from Consett to Shotley Bridge & Benfieldside (X5 clockwise loop / X15 anti-clockwise loop) pvr increase to 4.

Changes on Vosa site for Lumier.

Although the extension doesn’t run at school times, so they won’t need any additional buses in total.
6358
RE: Go North East: Upcoming Service Changes v2

(24 Oct 2019, 9:16 pm)Wybus wrote Although the extension doesn’t run at school times, so they won’t need any additional buses in total.


1 bus will presumably go on an/pm scholars but a quick look at the following;


09:15 CBS

09:53 DBS arr

10:00 DBS dep

10:39 CBS arr

10:44 CBS dep

Shotley Bridge loop

11:10 CBS arr


Equal to 4 buses, currently 3. Hope that clears it.

Site Administrator
RE: Go North East: Upcoming Service Changes v2
(25 Oct 2019, 9:51 am)Stanleyone wrote


1 bus will presumably go on an/pm scholars but a quick look at the following;


09:15 CBS

09:53 DBS arr

10:00 DBS dep

10:39 CBS arr

10:44 CBS dep

Shotley Bridge loop

11:10 CBS arr


Equal to 4 buses, currently 3. Hope that clears it.

Yes, it's essentially just one of the scholars buses finding work in between the AM/PM split.

Sent from my SM-G960F using Tapatalk
RE: Go North East: Upcoming Service Changes v2

(24 Oct 2019, 5:25 am)Stanleyone wrote Couple of changes from 3rd of November.

V9 re-routed to serve Elm Park (Shotley Bridge)

X5/X15 extended from Consett to Shotley Bridge & Benfieldside (X5 clockwise loop / X15 anti-clockwise loop) pvr increase to 4.

Changes on Vosa site for Lumier.


So when the V9 reaches the end of Benfieldside Road in Shotley Bridge, it will turn right instead past Elm Park, up towards Medomsley then go down Ebchester Bank past the Derwent Walk Inn to Ebchester?


Buses coming back from Chopwell will struggle going up Ebchester Bank the other way for sure if that is the case.

6358
RE: Go North East: Upcoming Service Changes v2

(25 Oct 2019, 10:52 am)DH9 wrote


So when the V9 reaches the end of Benfieldside Road in Shotley Bridge, it will turn right instead past Elm Park, up towards Medomsley then go down Ebchester Bank past the Derwent Walk Inn to Ebchester?


Buses coming back from Chopwell will struggle going up Ebchester Bank the other way for sure if that is the case.



In my opinion if it’s a streetlite it will struggle, but some of those minibuses will be ok.

RE: Go North East: Upcoming Service Changes v2

(25 Oct 2019, 10:52 am)DH9 wrote


So when the V9 reaches the end of Benfieldside Road in Shotley Bridge, it will turn right instead past Elm Park, up towards Medomsley then go down Ebchester Bank past the Derwent Walk Inn to Ebchester?


Buses coming back from Chopwell will struggle going up Ebchester Bank the other way for sure if that is the case.



Assuming that these changes are connected to the conversation in the tender thread a few months back.

https://northeastbuses.co.uk/forum/showthread.php?tid=848&page=51


Not a bad little earner diverting one service and extending another, using a vehicle that would otherwise be standing idle.


Hopefully the services are sustainable enough to last beyond the end of the funding.

'Illegitimis non carborundum'
Site Administrator
RE: Go North East: Upcoming Service Changes v2

(25 Oct 2019, 1:01 pm)Andreos1 wrote


Assuming that these changes are connected to the conversation in the tender thread a few months back.

https://northeastbuses.co.uk/forum/showthread.php?tid=848&page=51


Not a bad little earner diverting one service and extending another, using a vehicle that would otherwise be standing idle.


Hopefully the services are sustainable enough to last beyond the end of the funding.



Yes it is, other improvements to the services include retrofitting free Wi-Fi and Next Stop Announcements.

RE: Go North East: Upcoming Service Changes v2
(25 Oct 2019, 1:04 pm)Dan wrote


Yes it is, other improvements to the services include retrofitting free Wi-Fi and Next Stop Announcements.


Is that for all the Venture services?
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes v2

(24 Oct 2019, 4:34 pm)Arcticrossy92 wrote Any reason for the Extension to the X5/X15, is it replacing something, or is it something new because of increased Demand?
  will this replace the Tesco bus T1

RE: Go North East: Upcoming Service Changes v2

(30 Oct 2019, 8:39 pm)Jimbo wrote

  will this replace the Tesco bus T1



I don't personally believe it will, somebody is paying out for that contract to run -- and it has stipulations about when and where you can board.