RE: North East Combined Authority
(Yesterday, 9:42 pm)stagecoachbusdepot wrote Strongly dislike the idea of diverting services to different places at different times of the day, it's just confusing for everyone - kind of like when Stagecoach in Sunderland inexplicably had the 3 running to two totally separate termini on alternating points in the hour. Its not even great with the likes of the 21 where it has multiple versions but at least they all serve the same route just stopping short. If services are going to run to different places, give them a different number.
Problem with serving office parks and the like is that there's potential demand at shift changeovers and pretty much nothing in between. I don't think taking resource from main services at those times is the answer (nor is it how they should release buses for scholars leaving holes in core routes but hey ho) though - for the reasons above and because of course that pre-supposes people want to go from TVTE to wherever the (21 in this example) happens to go.
It seems to work for the Teams - Newcastle services which divert via Centrelink on a morning peak.
Or the X24a, which diverts via Doxford International.
But, ultimately whatever the network is now, it's not working. Cutting/reducing and consolidating isn't working either.
I'm not sure we need to go down the Moto hub route that was suggested a while back (although it was different and there were positives), but it's clear something different needs introducing. A peak time diversion, via key employment locations (to me), seems like a good starting point.
- It won't need a dedicated resource.
- It won't run once a day in either direction.
- Through passengers would supplement those making shorter journeys.
- It could complement the existing (but limited) services in the area.
- A prefix P could be used to help identify those Peak services.
(Today, 9:43 am)Ambassador wrote Team Valley is a difficult one as it's one of the few places in the network where the hub and spoke model works.
From Birtley/CLS you've got the 937 (for the peak) and outside of that the 21 to 93/4 connection works pretty well, even coming from the North the connection at Gateshead is pretty decent.
If they worked that well, they would be full and people would be using them.
You'd not have the car park through Lamesley or the need to widen the A1 either.
Using the 937 as an example, it would only be suitable for those very few people starting at 8am and finishing at 5pm and working Monday to Friday (guessing it would take people over the WTD as well).
Start or finish later and you've got the delights of changing at Low Fell or the Interchange. Assuming there's room to get on a 21 and it isn't beset by delays.
On a personal level, I used to work at Team Valley.
As a fan of public transport and as a driver fed up of the A1, I tried the bus on more than one occasion.
The journey was approx 9 miles in the car. Took anything from 30mins to an hour.
The bus - well, it always meant 2 changes. Sometimes 3 (depending which way I went).
Took 90 minutes on average.
Max roundtrip of 2 hours in the car. Often less.
Min roundtrip on the bus of 3 hours.
That's on top of an 8 hour day at work.
It shouldn't take that long and it shouldn't be that complicated.
'Illegitimis non carborundum'