RE: New Housing near Palmersville
(3 hours ago)Nerd4321 wrote I see the 19 is being routed out of East Bailey which tbf is actually a good idea since the 354 & 356 currently do the same thing.
I wonder if the 19 from Cramlington will be routed through the bottom part of Killingworth Moor as it seems to link up to that road instead of following the back road
The 38 seems decent tbf giving people in the part of that area a bus link to Killingworth. It wouldn't surprise me that the 353 is routed to do a loop of the housing estate as well
I will say this is amazing that they are working with people for bus routes since places like the two housing estates near alpha. Them two have 2 bus routes being the X7/X8 yet have nothing in the estate and its a hell of a walk to the bus stops that go nowhere unless you want to go to Newcastle or Cramlington/Blyth
See I think the 38 is too long winded like that.
Personally I'd move the 18/37/38/X7/X63 all around and create something like:
X7: Newcastle to Blyth via Killingworth (Every 30 Minutes)
37/38: Killingworth/Benton Loop (Every 20 Minutes Each)
18: Extended to Cramlington via Killingworth (Every 30 Minutes)
The X7 is useless right now, get it through Killingworth and support the X63 which doesn't seem to be a glory of success either in recent years; who knows maybe they could be every 20 minutes combined - even if you cut some short like in Seaton Delaval because the loads beyond it right now are dire (they've never been strong even before the train anyway).
The rest is just creating new links since 37/X8 shadow each other so why not send it through to Walker/Byker instead and the 37/38 is just imo tidier and quicker to Killingworth with the X7 picking the Northern side.