RE: Electric Buses/new orders
(15 Nov 2026, 8:20 am)Storx wrote They'll end up at Riverside for the 51/52/93/94 imo. Those B9TL's are 17 year old now and really need replacing.
The 301 would be a better choice for the Cobalt B9TLs and probably an upgrade over the StreetLites.
On another note, could the 12m B8L EvoSeti not be an option for some GNE services?
There must be a reason why Volvo are not doing a Bi-Axile B8TL and are sticking with Tri-Axile especially if this is more durable and reliable.
Despite already having an order placed, the X1 would be a sensible route (with another route benefiting from Ultroliners) as it's profitable and there doesn't seem to be any limitations for a 12m vehicle given I think GNE have previously operated 12m OmniDekkas on the X1. A vehicle type that GNE could run into the ground for 15+ years on the same route.
The 10/10A/10B would also be a good candidate although not sure the 12m length would be a good choice through some of the villages?